215 Airport Rd
Sulphur Springs, TX 75482 · Christus Health
Christus clinic registered for 215 Airport Rd
A new 16,365-square-foot clinic for Christus Health is planned at 215 Airport Rd. Its TDLR project registration was filed June 28, 2024, and lists an applicant-estimated project cost of $6 million. The record identifies the project as new construction and lists its status as Project Closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 28, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 28, 2024
- since Jun 28, 2024
- Largest scope
- 16,365 sf
- Estimated cost
- $6.0M
- state registration
Where this project stands
CompletedCSS Clinic
16,365 sq ft · $6.0M est.
- RegisteredJun 28, 2024
- Plan review
- ConstructionAug '24 – Aug '25
- Inspected
- Closed
Ran as a 12-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectA new 16,365 sq ft clinic on new site. construction is class a, steel framed building with light gauge metal framed walls with masonry, metal panels, and storefront / curtainwall systems. the building is type 2-b construction type and is fully sprinkled — christus sulphur springs clinic
TDLR project registrationNew ConstructionProject Closed16,365 sq ft$6.0M est.- Project #
- TABS2024021928
- Tenant / owner
- Css Clinic
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 215 Airport Rd
What is being built at 215 Airport Rd in Sulphur Springs?
A new 16,365-square-foot clinic for Christus Health is listed in a TDLR project registration filed June 28, 2024.
Is Christus Health opening a clinic at 215 Airport Rd?
The TDLR record describes a new clinic called CSS Clinic for Christus Sulphur Springs. It does not provide an opening date.
How large is the new clinic in Sulphur Springs?
The registered clinic is 16,365 square feet.
How much will the Christus clinic cost?
The TDLR registration lists an applicant-estimated project cost of $6 million. This is an estimate, not a confirmed final cost.
When was the 215 Airport Rd clinic registered?
The TDLR project registration for CSS Clinic was filed June 28, 2024.
What will the new clinic building look like?
The registration describes a steel-framed, fully sprinklered building with masonry, metal panels, and storefront or curtainwall systems.
Is the clinic at 215 Airport Rd finished?
The TDLR record lists the project status as Project Closed, but does not state whether construction is complete or the clinic has opened.