Historic · latest filing Sep 2024Commercial

405 Long Creek Road

Sunnyvale, TX 75182 · Eastside Water Treatment Plant Administration Building

Water testing lab expansion at Sunnyvale treatment plant

Dallas Water Utilities is renovating and expanding the existing water testing lab at the Eastside Water Treatment Plant administration building at 405 Long Creek Road. A TDLR project registration filed September 12, 2024, describes an expansion from 5,500 square feet to about 7,100 square feet. The applicant’s estimated project cost is $10.2 million.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 12, 2024

Projects
1
1 filings
Latest filing
Sep 12, 2024
since Sep 12, 2024
Largest scope
7,095 sf
Estimated cost
$10M
state registration

Where this project stands

Under construction

Dallas Water Utilities WTP Laboratory Renovation

7,095 sq ft · $10M est.

  1. RegisteredSep 12, 2024
  2. Plan review
  3. ConstructionNov '24 – Jan '27
  4. Inspected
  5. Closed
94% through of a 26-month buildNov 1, 2024 → Jan 11, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Renovation and expansion of existing 5,500 sq ft water testing lab at eastside water treatment plant for dallas water utility. scope captures additional second floor space and first floor carport to expand water testing lab to 7,100 sq ft — eastside water treatment plant administration building

    TDLR project registrationRenovation/AlterationReview Complete7,095 sq ft$10M est.
    Tenant / owner
    Dallas Water Utilities Wtp Laboratory Renovation
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 405 Long Creek Road

What is being built at 405 Long Creek Road in Sunnyvale?

The project is a renovation and expansion of an existing water testing lab at the Eastside Water Treatment Plant administration building. The lab is planned to grow from 5,500 square feet to about 7,100 square feet.

Is a new water testing lab going in at 405 Long Creek Road?

The TDLR registration describes an expansion of an existing lab, not a new standalone lab. The work adds second-floor space and a first-floor carport area.

When was the water lab expansion registered?

The TDLR project registration was filed September 12, 2024. It is listed as TABS2025000831, with status “Review Complete.”

How large will the expanded water testing lab be?

The project registration lists 7,095 square feet. The project description rounds the planned size to about 7,100 square feet, up from 5,500 square feet.

How much will the Eastside Water Treatment Plant lab renovation cost?

The applicant’s estimated cost for the project is $10.2 million. This is an estimate in the TDLR registration.

What is being built near 635-80 Dc on Long Creek Road?

At 405 Long Creek Road, about 348 meters from 635-80 Dc at 400 Long Creek Road, a water testing lab at the Eastside Water Treatment Plant is being renovated and expanded. The TDLR registration was filed September 12, 2024.

Also being built nearby

All of 75182