1067 Sunflower Trl
Sunset Valley, TX 78745
Backup battery system planned at 1067 Sunflower Trail
An Austin electrical permit indicates a backup battery system and additional meter socket are planned at 1067 Sunflower Trail. The permit was filed on November 6, 2026, and is listed as active.
Summarized from City of Austin records · updated Nov 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2026
- since Nov 6, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBase: installing a backup battery system and additional meter socket
- AppliedOct 19, 2026
- IssuedNov 6, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-137305 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1067 Sunflower Trl
What is being installed at 1067 Sunflower Trail?
An Austin electrical permit describes installation of a backup battery system and an additional meter socket.
When was the permit for 1067 Sunflower Trail filed?
The permit was filed on November 6, 2026.
What is the permit number for the work at 1067 Sunflower Trail?
The permit number is 2026-137305 EP. It is listed as an active electrical permit.
Is a new building planned at 1067 Sunflower Trail?
The record describes electrical work to install a backup battery system and an additional meter socket; it does not describe a new building.
What is being installed near Austin ISD–Burger Baseball Improvements?
At 1067 Sunflower Trail, about 498 meters from Austin ISD–Burger Baseball Improvements at 3200 Jones Road, an electrical permit indicates a backup battery system and additional meter socket.
Also being built nearby
All of 78745- 1031 Sunflower TrlJun 11, 2024Install tesla powerwall 3 - 19.32 kw dc · 52 m away
- 1002 Sunflower TrlFeb 7, 2025Request to disconnect installation of a 150a transfer switch and generator with existing 150a meter can to remain · 63 m away
- 1008 Sunflower TrlNov 5, 2024Install new 17.425kw rooftop solar system for existing residential only · 113 m away
- 3207 Jones RdFeb 5, 2025Solar panel installation · 236 m away
- 3203 Jones RdMar 10, 2025Request to disconnect installing a tap box/larger gutter box · 352 m away
- 3205 Jones Rd · City Of Sunset ValleyFeb 27, 2024Home depot blvd and ernest robles way pavement repairs and pedestrian improvements — renovation/alteration — installation of two raised crosswalks and reconstructing sidewalk to accommodate drainage infrastructure along ernest robles way, approximately 3,000 sq ft · 394 m away
- 23 Yellow Tail CvJan 7, 2026Repair permit needed to install a transfer switch residential property in the etj. permit for the shut down as a repair (disconnect/reconnect of service) · 394 m away
- 3200 Jones Rd · Austin Independent School DistrictAug 18, 2026Austin isd- burger baseball improvements — renovation/alteration — renovation of baseball field to synthetic turf and reconstructing existing dug out to be below grade with lighting power and drinking fountains. adding bull pens and batting cages. adding companion seat to ada seating area sq ft 161,572 · 498 m away
- 5 Yellow Tail CvMar 18, 2024Installing generator and automatic transfer switch · 499 m away
- 19 Lovegrass LnDec 4, 2023Install new 5.22kw rooftop solar system for existing residential only. this is in addition to an existing solar system · 581 m away
- 30 Lone Oak TrlSep 14, 2025Upgrade and rebuilt of old overhead electrical service 125 amp no main to a new overhead electrical service 200 amp with main breaker at service panel · 582 m away