3060-3064 S. 31st Street
Temple, TX 76502 · Cpus Marketplace LP
Retail building remodel planned at 3060 S. 31st Street
A 30,086-square-foot retail building at 3060–3064 S. 31st Street is slated for a remodel, including a recessed loading dock and new interior finish-out. The project was registered with the Texas Department of Licensing and Regulation on August 19, 2026, and the filing describes the finish-out as T.J. Maxx-related. The applicant estimates the project cost at $1.722 million.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 19, 2026
- since Aug 19, 2026
- Largest scope
- 30,086 sf
- Estimated cost
- $1.7M
- state registration
Where this project stands
Approved · construction starts Dec 1, 2026Marketplace Shopping Center Remodel and Interior Finish-Out
30,086 sq ft · $1.7M est.
- RegisteredAug 19, 2026
- Plan review
- ConstructionDec '26 – May '27
- Inspected
- Closed
A 5-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRemodel of a 30,086 sq ft retail building with a new recessed loading dock and new interior finish-out. — t.j. maxx
TDLR project registrationRenovation/AlterationReview Complete30,086 sq ft$1.7M est.- Project #
- TABS2026028282
- Tenant / owner
- Marketplace Shopping Center Remodel And Interior Finish-Out
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3060-3064 S. 31st Street
What is being built at 3060–3064 S. 31st Street in Temple?
A 30,086-square-foot retail building is slated for a remodel with a new recessed loading dock and interior finish-out. The TDLR registration, filed August 19, 2026, describes the finish-out as T.J. Maxx-related.
Is a T.J. Maxx going in at 3060 S. 31st Street?
The TDLR project description identifies the interior finish-out as T.J. Maxx-related. The filing does not provide an opening date.
What work is planned at 3060–3064 S. 31st Street?
The registration describes a remodel of a 30,086-square-foot retail building, including a recessed loading dock and new interior finish-out. It was filed August 19, 2026 under project number TABS2026028282.
How much will the 3060 S. 31st Street remodel cost?
The applicant's estimated cost for the project is $1.722 million, according to the TDLR registration filed August 19, 2026.
What's being remodeled near Skechers on South 31st Street?
A retail building at 3060–3064 S. 31st Street is slated for a remodel and interior finish-out. Skechers is listed nearby at 3040 S. 31st Street.
Is there a new retail project near Walmart on South 31st Street in Temple?
A 30,086-square-foot retail building at 3060–3064 S. 31st Street is slated for a remodel. Walmart 746.249 is listed nearby at 3401 S. 31st Street.
Also being built nearby
All of 76502- 3048 S 31st St · Erep Market Place I, LLCApr 11, 2024Daiso — renovation/alteration — this is an existing retail establishment being remodeled for a new tenant with updated equipment, fixtures, and finishes. exterior work includes adding a new overhead door at the back of the tenant space for loading area · 16 m away
- 3040 South 31st Street · Erep Market Place I, LLCNov 4, 2025Skechers — renovation/alteration — 8067 sq ft single storey tenant improvement of existing retail space - new partitions and fixtures · 24 m away
- 3130 S 31st Street · Erep Market Place I, LLCApr 15, 2025Hibbett #672 temple, tx — renovation/alteration — tenant b.o. of exst'g vacant retail space: construct new sales area, stock room, corridor, fitting room, restrooms; new lighting & power per plan-connect to existing elect. panel; light mechanical work (relocation of supply/return devices) · 67 m away
- 2934 S 31st Street · Erep Market Place I, LLCDec 11, 2024All star liquor — renovation/alteration — install floor, reno bathroom, new customer service counter top, fom insulation · 131 m away
- 2930 S. 31st Street · Erep Market Place LLCNov 21, 2024Salon centric — renovation/alteration — tenant improvement - 1995 sq ft · 135 m away
- 3111 S. 31 Street · Dillard's Department StoresJun 12, 2025Dillard's - new pump room — renovation/alteration — add a new sprinkler pump room and exterior door · 136 m away
- 2904 S 31 St · Erep Market Place I, LLCMay 16, 202589 temple — renovation/alteration — tenant finish out to include, plumbing, electrical, mechanical, framing, insolation, drywall, finish outs, installation of furniture, fixtures, lighting fixtures, painting and floor · 162 m away
- 1415 SW Hk Dodgen Loop · Tri County Properties LLCJul 9, 2026Whataburger #957 remodel — renovation/alteration — remodel of an existing whataburger · 261 m away
- 3306 S 31st Street · Murphy Oil Usa, INCOct 14, 2024Temple, tx/murphy # 7141 — new construction — new fuel station with 6mpd's and associated utility and landscape · 341 m away
- 3401 S. 31st St · Walmart, Inc.Aug 11, 2026Walmart 746.249 temple, tx — renovation/alteration — remodel of exterior includes updated paint, signage and striping; interior includes new refrigerated cases, interior paint, removal of vct flooring, updated finishes and lighting · 375 m away
- 3401 S 31st Street · Wal-Mart Real Estate Bus TrustOct 18, 2024Walmart 00746.1002 temple tx - ess project — renovation/alteration — install interior & exterior door(s), re-work existing exterior pavement in accommodation of new exterior door(s), update door hardware. 100sqft · 375 m away
- 3403 S. 31st Street · Mcdonald'sFeb 22, 2024Mcdonald's (42-1170 sao-2) temple — renovation/alteration — new customer service area, new dining and play place area finishes per decor and new plumbing fixtures and finishes at restrooms · 423 m away
More retail spaces in 76502.