3101 Industrial Boulevard
Temple, TX 76504 · Polmer, LLC
312-square-foot concrete guardhouse planned in Temple
A 312-square-foot precast concrete guardhouse with a slab-on-grade foundation is planned at 3101 Industrial Boulevard in Temple. The TDLR project registration was filed December 13, 2024, and lists an estimated project cost of $500,000. The registration status is Project Closed.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 13, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 13, 2024
- since Dec 13, 2024
- Largest scope
- 312 sf
- Estimated cost
- $500K
- state registration
Where this project stands
CompletedTTX Data Center
312 sq ft · $500K est.
- RegisteredDec 13, 2024
- Plan review
- ConstructionJan '25 – Mar '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectConstruction of a new pre-cast concrete guardhouse with slab-on-grade foundation. — guard house
TDLR project registrationAdditions to Existing BuildingProject Closed312 sq ft$500K est.- Project #
- TABS2025007641
- Tenant / owner
- Ttx Data Center
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3101 Industrial Boulevard
What is being built at 3101 Industrial Boulevard in Temple?
A 312-square-foot precast concrete guardhouse with a slab-on-grade foundation is listed in a TDLR project registration filed December 13, 2024.
Is a new guardhouse planned at 3101 Industrial Boulevard?
Yes. The TDLR registration describes construction of a new precast concrete guardhouse at the address.
When was the 3101 Industrial Boulevard project filed?
The TDLR project registration was filed December 13, 2024. Its project number is TABS2025007641.
How large is the guardhouse planned for 3101 Industrial Boulevard?
The TDLR registration lists the guardhouse at 312 square feet.
How much will the 3101 Industrial Boulevard guardhouse cost?
The TDLR registration lists an estimated project cost of $500,000. This is an estimate, not a confirmed final cost.
Is the 3101 Industrial Boulevard project still open?
The TDLR registration lists the project status as Project Closed.