0 Beacon Point Drive
Texas City, TX 77539 · Beacon Point - Phase 2, Beacon Point Phase 1 (entry)
Beacon Point entry and pedestrian walkways
TDLR registrations describe new subdivision entry work and pedestrian walkways at the multi-tenant Beacon Point site in Texas City. The entry registration was filed September 27, 2024, and the Phase 2 registration was filed March 7, 2025.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 7, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 7, 2025
- since Sep 27, 2024
- Largest scope
- 364,052 sf
- Estimated cost
- $1.3M
- state registration
Where this project stands
Finishing up · inspection nextBeacon Point - Phase 2
364,052 sq ft · $1.3M est.
- RegisteredMar 7, 2025
- Plan review
- ConstructionApr '25 – Apr '26
- Inspectednow
- Closed
Scheduled to finish Apr 30, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsProject includes a pedestrian walkway along residential streets, planting areas, trees through the streetscape and ponds, and turf areas. scope of work for additional walkway: additional pedestrian walkway at detention pond behind residential lots — beacon point - phase 2
TDLR project registrationNew ConstructionReview Complete364,052 sq ft$1.3M est.- Project #
- TABS2025013671
- Tenant / owner
- Beacon Point - Phase 2
- Design firm
- Pro
- Contact
- Pro
Subdivision entry development and sidewalks — beacon point subdivision entry
TDLR project registrationNew ConstructionReview Complete209,100 sq ft$900K est.- Project #
- TABS2025002003
- Tenant / owner
- Beacon Point Phase 1 (entry)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 0 Beacon Point Drive
What is being built at 0 Beacon Point Drive?
TDLR registrations describe subdivision entry work, sidewalks, and additional pedestrian walkways, along with planting areas, trees, ponds, and turf. The site is identified as a multi-tenant development.
What is Beacon Point Phase 2?
The Phase 2 registration describes pedestrian walkways along residential streets and an additional walkway by a detention pond behind residential lots. It was filed March 7, 2025, under TDLR project number TABS2025013671.
When was the Beacon Point project registered?
The earliest listed registration, for subdivision entry work and sidewalks, was filed September 27, 2024. The Phase 2 registration followed on March 7, 2025.
Is there a new subdivision entrance planned at Beacon Point?
A TDLR registration filed September 27, 2024, describes subdivision entry development and sidewalks for Beacon Point. The project number is TABS2025002003.
How much will the Beacon Point Phase 2 work cost?
The applicant's TDLR estimate for Beacon Point Phase 2 is $1,252,636. This is an estimate for that registered project, not a confirmed final cost.