3 Waterway Square Place
The Woodlands, TX 77380 · Waste Connections Level 4, Waste Connections - Level 3 + 2 more
Office renovations on multiple floors at 3 Waterway Square Place
TDLR registrations indicate office renovations and build-outs on levels 3 through 6 of this multi-tenant building. The filings run from December 7, 2023, through April 7, 2025, and describe work including open-office areas, private offices, conference rooms, and interior updates.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 7, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Apr 7, 2025
- since May 10, 2024
- Largest scope
- 5,112 sf
- Estimated cost
- $3.1M
- state registration
Where this project stands
CompletedWaste Connections Level 4
1,393 sq ft · $60K est.
- RegisteredApr 7, 2025
- Plan review
- ConstructionApr '25 – Aug '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
5 projectsInterior renovation varying from electrical and lighting changes to minor demolition and build-back — 3 waterway
TDLR project registrationRenovation/AlterationProject Closed1,393 sq ft$60K est.- Project #
- TABS2025016078
- Tenant / owner
- Waste Connections Level 4
- Design firm
- Pro
- Contact
- Pro
This project consists of a partial renovation of an existing office space. — 3 waterway square place
TDLR project registrationRenovation/AlterationProject Closed3,218 sq ft$1.3M est.- Project #
- TABS2024020953
- Tenant / owner
- Waste Connections - Level 3
- Design firm
- Pro
- Contact
- Pro
This project consists of primarily an open office renovation. scope of work includes open office areas with workstations, conference rooms, elevator lobby, and storage rooms. — 3 waterway square
TDLR project registrationRenovation/AlterationProject Closed3,218 sq ft$372K est.- Project #
- TABS2024018948
- Tenant / owner
- Waste Connections - Level 4
- Design firm
- Pro
- Contact
- Pro
This project consists of an open office build-out. scope of work includes elevator lobby, open office areas with workstations, private offices, conference rooms, storage rooms, waiting area, focus rooms, and break room. — 3 waterway square
TDLR project registrationRenovation/AlterationProject Closed5,112 sq ft$750K est.- Project #
- TABS2024018287
- Tenant / owner
- Waste Connections - Level 5
- Design firm
- Pro
- Contact
- Pro
This project consists of primarily an private office build-out. scope of work includes open office areas with workstations, private offices, conference rooms, storage rooms, reception area and break room. — 3 waterway square place
TDLR project registrationRenovation/AlterationProject Closed18,887 sq ft$3.1M est.- Project #
- TABS2024006877
- Tenant / owner
- Waste Connections - Level 6
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3 Waterway Square Place
What is being built at 3 Waterway Square Place?
TDLR filings describe office renovations and build-outs on multiple floors of the multi-tenant building. The work includes open-office areas, private offices, conference rooms, and other interior updates.
When were the projects at 3 Waterway Square Place filed?
The records span December 7, 2023, through April 7, 2025. The latest filing, TABS2025016078, is dated April 7, 2025, and describes a Level 4 interior renovation.
Is Waste Connections renovating the whole building at 3 Waterway Square Place?
The filings identify Waste Connections projects on levels 3 through 6, but the address is listed as a multi-tenant building. The records describe work on specific office floors, not a renovation of the entire building.
What work is planned on Level 5 at 3 Waterway Square Place?
A May 10, 2024, TDLR filing, TABS2024018287, describes a 5,112-square-foot office build-out with workstations, private offices, conference rooms, storage, a waiting area, focus rooms, and a break room.
What is being renovated near 4 Waterway Square Place?
At 3 Waterway Square Place, TDLR records describe office renovations on levels 3 through 6. A Level 4 renovation filed April 7, 2025, includes electrical and lighting changes, minor demolition, and build-back.
How much will the 3 Waterway Square Place renovations cost?
The applicant's estimated cost for the project is $3.1 million, according to the TDLR fact sheet. Individual filings report separate values for their scopes of work.
Also being built nearby
All of 77380- 10001 Woodloch Forest Drive · 2 Waterway Holdings LLCOct 3, 2025Kimley horn woodlands (39-25170-00) — renovation/alteration — interior corporate office to include demolition of existing conditions, new offices, conference rooms, break room, copy room and open office workstation areas · 14 m away
- 10001 Woodloch Forest · Eat 2 Waterway Holdings LLCAug 27, 2026Guidepost — renovation/alteration — renovation of existing suite within an existing building · 14 m away
- 4 Waterway Square Place · 4 Waterway Holdings LLCOct 14, 2024Ovintiv - level 1 collaboraion space and reception — renovation/alteration — level 1: 2,214 sq ft - interior renovation of existing space · 63 m away
- 4 Waterway Square Place (suite · 4 Waterway Holdings LLCAug 9, 2024Ovintiv - levels 5 & 8 renovation — renovation/alteration — level 5: 1,193 sq ft & level 8: 1,155 sq ft · 63 m away
- 1450 Lake Robbins Drive · Town Center OneAug 19, 2024Tc1 bilfinger — renovation/alteration — interior renovation of lease space on level 6. renovation to include modification of walls, new finishes, and modified electrical · 97 m away
- 1450 Lake Robbins Dr · Svn International CorpJul 17, 2024Amwins partial interior renovation - woodlands expansion — renovation/alteration — expansion of existing suite with construction of 11 new offices and 20 workspaces at open office space with update to 2 existing spaces. 2394 sq ft of renovation to include new finishes, act, lighting, hvac and sprinkler heads · 97 m away
- 9950 Woodlock Forest Dr · Hower Hughes CorporationFeb 27, 2024Tc the woodlands — new construction — finish out of suite for office space. work includes new partition layout, mechanical, electrical and plumbing · 112 m away
- 9950 Woodloch Forest Dr · Hh Hackett Tower Holdings LLCJul 1, 2026Howard hughes - existing corporate small — renovation/alteration — tenant interior renovation of approximately 3,300 sq ft on two floors in an existing office building · 112 m away
- 9950 Woodloch Forest · Hh Hackett Tower HoldingsJan 22, 2026Ab energy — renovation/alteration — interior renovation of 2 suites that will become one. restroom and elevator lobby are excluded · 112 m away
- 9950 Woodloch Forest Drive · Hh Hackett Tower Holdings, LLCFeb 9, 2026Centric infrastructure — renovation/alteration — interior renovation of existing lease space · 112 m away
- 1330 Lake Robbins Dr · Town Center 72, LLCNov 20, 2024Woodforest national bank - commercial lending — renovation/alteration — interior renovation of existing office space, break room, and private offices · 201 m away
- 1330 Lake Robbins Drive · Town Center 72 LLCOct 21, 2026Svn - risk strategy — renovation/alteration — interior renovation of lease space on level 04. renovation to include modification of walls, new finishes, modified electrical and plumbing · 201 m away
More demolitions in 77380, warehouses & industrial in 77380, offices in 77380.