Tomball Medical Center plans shell building and clinic build-outs

TDLR registrations from October and November 2024 describe a proposed shell building and interior medical build-outs at 13110 Medical Complex Drive. The multi-tenant project includes spaces registered for Tomball Medical Center Cardiology and Tomball Medical Center Gastroenterology, as well as a 15,447-square-foot shell building.

Summarized from Texas Department of Licensing and Regulation records · updated Nov 6, 2024

Projects
3
3 filings
Latest filing
Nov 6, 2024
since Oct 15, 2024
Largest scope
15,447 sf
Estimated cost
$400K
state registration

Where this project stands

Finishing up · inspection next

TOMBALL MEDICAL CENTER CARDIOLOGY

5,792 sq ft · $400K est.

  1. RegisteredNov 6, 2024
  2. Plan review
  3. ConstructionJun '25 – Nov '25
  4. Inspectednow
  5. Closed

Scheduled to finish Nov 20, 2025; the state inspection hasn't been filed yet.

4 contacts on this project · 3 phone numbers

Permit & project history

3 projects
  1. The scope of this project is the design of a proposed interior medical space build-out within an existing shell building. provide restrooms, floor tile, ceiling, electrical, plumbing and mechanical features. — tomball medical center cardiology

    TDLR project registrationNew ConstructionReview Complete5,792 sq ft$400K est.
    Tenant / owner
    Tomball Medical Center Cardiology
    Design firm
    Pro
    Contact
    Pro
  2. The scope of this project is the design and construction of an interior leased build-out. the scope of work is composed but not limited to new structure, and new building systems. — tomball medical center gastroenterology

    TDLR project registrationNew ConstructionReview Complete2,015 sq ft$200K est.
    Tenant / owner
    Tomball Medical Center Gastroenterology
    Design firm
    Pro
    Contact
    Pro
  3. Design and construction of a pre-fab metal shell building. — tomball medical center

    TDLR project registrationNew ConstructionReview Complete15,447 sq ft$85K est.
    Tenant / owner
    Tomball Medical Center - Shell Building
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 13110 Medical Complex Drive

What is being built at 13110 Medical Complex Drive in Tomball?

TDLR registrations describe a pre-fabricated metal shell building and interior build-outs for Tomball Medical Center Cardiology and Tomball Medical Center Gastroenterology. The filings were dated October 15 and November 6, 2024.

Is Tomball Medical Center building a new clinic at 13110 Medical Complex Drive?

The registrations describe interior medical build-outs within the multi-tenant site, including spaces for cardiology and gastroenterology. They do not establish an opening date.

What is planned for the Tomball Medical Center shell building?

A TDLR registration dated October 15, 2024, describes design and construction of a pre-fabricated metal shell building measuring 15,447 square feet. The filing is TABS2025003223.

How large is the Tomball Medical Center cardiology build-out?

The cardiology interior build-out is listed at 5,792 square feet. Its TDLR registration, TABS2025004982, was dated November 6, 2024.

Is there a gastroenterology space planned at 13110 Medical Complex Drive?

Yes. A November 6, 2024, TDLR registration describes an interior leased build-out for Tomball Medical Center Gastroenterology, listed at 2,015 square feet. The registration is TABS2025004988.

When were the Tomball Medical Center projects registered?

The shell building registration was dated October 15, 2024. The cardiology and gastroenterology build-out registrations were dated November 6, 2024.