8711 Creekside Green Drive
Tomball, TX 77375 · Tomball ISD
Creekside Park Junior High fifth-grade addition
Tomball ISD registered a two-story fifth-grade addition at Creekside Park Junior High, including an expanded cafeteria and renovations to its finishes. The TDLR project was filed September 24, 2024, under record TABS2025001714; the listing shows an estimated project cost of $23.7 million and an Inspection Complete status. A separate filing for the same address dated August 6, 2026, describes athletic improvements to the football field and track.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 24, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 24, 2024
- since Sep 24, 2024
- Largest scope
- 299,865 sf
- Estimated cost
- $24M
- state registration
Where this project stands
Inspected · closing outTomball ISD - Creekside Park JH 5th Grade Addition
299,865 sq ft · $24M est.
- RegisteredSep 24, 2024
- Plan review
- ConstructionDec '24 – Jun '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 project5th grade 2-story addition, including cafeteria expansion and renovation of cafeteria finishes to include replacement of flooring, paint and lay-in ceiling, additions to be considered as an extension of the existing fire building. — creekside park junior high school
TDLR project registrationAdditions to Existing BuildingInspection Complete299,865 sq ft$24M est.- Project #
- TABS2025001714
- Tenant / owner
- Tomball ISD - Creekside Park Jh 5th Grade Addition
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 8711 Creekside Green Drive
What is being built at 8711 Creekside Green Drive?
Tomball ISD registered a two-story fifth-grade addition at Creekside Park Junior High, with a cafeteria expansion and cafeteria finish renovations. The TDLR filing date is September 24, 2024.
Is Tomball ISD adding fifth-grade space at Creekside Park Junior High?
Yes. TDLR record TABS2025001714 describes a two-story fifth-grade addition at the school.
Is the cafeteria at Creekside Park Junior High being expanded?
The project description includes a cafeteria expansion and replacement of flooring, paint, and lay-in ceiling finishes.
How much will the Creekside Park Junior High addition cost?
The TDLR record lists an applicant-estimated project cost of $23.7 million. This is an estimate for the project, not a confirmed final cost.
Is the Creekside Park Junior High project complete?
The TDLR listing for TABS2025001714 shows the status as Inspection Complete. That status is what the public record reports.
What's being improved at Creekside Park Junior High in 2026?
A separate filing for the same address dated August 6, 2026, describes replacing the football field's natural turf with synthetic turf, resurfacing the track, adding a storage shed, and changing the field lights to LED.
Is Creekside Park Junior High near Walmart in Tomball?
The school address is about 399 meters from Walmart at 25800 Kuykendahl Road, according to the location data in the records.
Also being built nearby
All of 77375- 8711 Creekside Green Dr · Tomball ISDAug 6, 2026Tomball athletic improvements - cpjhs — renovation/alteration — convert existing natural turf football field to synthetic turf and resurface the existing track. add one new 375 sq ft storage shed to the track additionally change out the existing field lighting to new led fixtures
- 26213 Kuykendahl Rd · Creekside Four Holdings, LLCOct 15, 2024Kuykendahl retail project — new construction — new cold shell building with associated site work · 166 m away
- 25800 Kuykendahl Road · WalmartJul 28, 2026Walmart trash enclosure — new construction — trash enclosure · 399 m away
- 25800 Kuykendahl Rd, Tomball, TX 77389 · Walmart Real Estate Business TrustJul 15, 2024Walmart super center store 00351.277 — renovation/alteration — interior tenant improvement; remodel various areas in store, add mothers’ room if one isn't currently in store, paint fix, clean; relocate existing online pickup, possible expansion for online pickup. repaint exterior, repace signage · 399 m away
- 26435 Kuykendahl Rd · Creekside Park West Holdings, LLCDec 3, 2025Gymboree creekside park west — renovation/alteration — the scope includes new interior partitions, finishes, casework, classrooms, play areas, support spaces, restrooms, lighting, power, and limited structural work for rooftop mechanical support and plumbing trench infill · 502 m away
- 26435 Kuykendahl Road · Creekside Park West Holdings LLCSep 10, 2024Nekter spring texas — renovation/alteration — interior renovation of existing restaurant space into juice/smoothie bar, with modification of the mechanical, electrical, and plumbing systems. non-structural walls, furnishing, fixtures and equipment included · 502 m away
- 26400 Kuykendahl · Creekside Park Kobalt LLCAug 30, 2025Ortholonestar mso llc — renovation/alteration — renovation of existing office space to ortho doctor · 551 m away
- 26400 Kuykendahl · Creekside Park Kobalt, LLCNov 7, 2024Tiny tooth — renovation/alteration — interior build-out · 551 m away