15405 Pocket Oaks Trl
Tomball, TX 77377 · Malcomson Road Utility District
Hidden Lake trail and pedestrian crossings planned
A trail around a detention pond and pedestrian crossings along the trail are listed for 15405 Pocket Oaks Trl in Tomball. The TDLR project registration was filed Jan. 9, 2025, and describes 35,000 square feet of new construction. The applicant's estimated project cost is $260,000; the record lists the project status as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 9, 2025
- since Jan 9, 2025
- Largest scope
- 35,000 sf
- Estimated cost
- $260K
- state registration
Where this project stands
CompletedHidden Lake Trail and Pipeline Corridor Pedestrian Crossings
35,000 sq ft · $260K est.
- RegisteredJan 9, 2025
- Plan review
- ConstructionMay '25 – Aug '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThis project includes constructing a trail around a detention pond and installing pedestrian crossings along the trail. — hidden lake pond/birchview dr/lakewood trail/lakewood field dr/lakewood crossing dr
TDLR project registrationNew ConstructionProject Closed35,000 sq ft$260K est.- Project #
- TABS2025009138
- Tenant / owner
- Hidden Lake Trail And Pipeline Corridor Pedestrian Crossings
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 15405 Pocket Oaks Trl
What is being built at 15405 Pocket Oaks Trl?
A TDLR project registration describes a trail around a detention pond and pedestrian crossings along the trail. The project is named Hidden Lake Trail and Pipeline Corridor Pedestrian Crossings.
When was the Hidden Lake trail project filed?
The TDLR registration, project number TABS2025009138, was filed Jan. 9, 2025.
Is a trail planned near Building A, B, and C on Malcomson Drive?
The trail and pedestrian crossings project is listed at 15405 Pocket Oaks Trl, about 426 meters from Building A, B, and C at 12402 Malcomson Drive.
How much is the Hidden Lake trail project estimated to cost?
The TDLR registration lists an estimated project cost of $260,000. This is the applicant's estimate, not a confirmed final cost.
Is the Hidden Lake trail project complete?
The TDLR record lists the project status as closed. That status does not by itself confirm whether construction is complete.
Is a new building planned at 15405 Pocket Oaks Trl?
The available project description is for a trail around a detention pond and pedestrian crossings, not a new building.
Also being built nearby
All of 77377- 12402 Malcomson DriveJan 23, 2024Garage werks - garage condos park - phase i — new construction — 3 proposed garage storage shell buildings to be constructed. building a = 10,290 sq ft, building b = 10,997 sq ft, and building c = 8,800 sq ft · 426 m away
- 12402 Malcomson Dr · Garage Werks, LLCNov 4, 2026Malcomson iii - building d — new construction — proposed shell building only. future tenant be required to apply for separate permit prior to occupancy · 426 m away