5510 South Broadway Ave
Tyler, TX 75703 · Broadway Partners, Ltd.
Skechers remodel registered at Broadway Crossing in Tyler
A 9,910-square-foot interior remodel and exterior sign and finish work were registered for Skechers at 5510 South Broadway Ave. in Tyler. The Texas Department of Licensing and Regulation filing was dated July 22, 2024, and lists an estimated project cost of $350,000. The project is marked closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 22, 2024
- since Jul 22, 2024
- Largest scope
- 9,910 sf
- Estimated cost
- $350K
- state registration
Where this project stands
CompletedSkechers SKX 544R - Broadway Crossing
9,910 sq ft · $350K est.
- RegisteredJul 22, 2024
- Plan review
- ConstructionOct '24 – Jan '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior remodel. exterior work to include new signage and patch/repair of existing finishes — skechers
TDLR project registrationRenovation/AlterationProject Closed9,910 sq ft$350K est.- Project #
- TABS2024023593
- Tenant / owner
- Skechers Skx 544r - Broadway Crossing
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5510 South Broadway Ave
What is being built at 5510 South Broadway Ave. in Tyler?
The TDLR registration describes an interior remodel for Skechers, with new signage and repairs to existing exterior finishes. It does not describe a new building.
Is Skechers opening at Broadway Crossing?
The filing records a remodel for Skechers at Broadway Crossing, not a new store opening. The project is marked closed.
When was the Skechers remodel registered?
The TDLR project registration was filed on July 22, 2024. Its project number is TABS2024023593.
How large is the Skechers remodel in Tyler?
The TDLR registration lists the project at 9,910 square feet.
How much will the Skechers remodel cost?
The applicant's TDLR estimate is $350,000. This is an estimate, not a confirmed final cost.
What work is planned for the exterior of Skechers at Broadway Crossing?
The registration describes new signage and patching or repairs to existing finishes.
What is happening near Christus Health on South Broadway?
A Skechers interior remodel with exterior sign and finish work was registered at 5510 South Broadway Ave., about 134 meters from the listed Christus Health address at 5414 South Broadway Ave. The project is marked closed.
Also being built nearby
All of 75703- 5403 S Broadway Avenue · Genecov GroupMay 1, 2025Racquet & jog — additions to existing building — building expansion for sales and storage · 108 m away
- 5377 S Broadway · Genecov Investments LtdApr 3, 2025Roost chicken salad & deli — renovation/alteration — interior remodel of existing tenant space 5000 sq ft · 131 m away
- 5414 S Broadway Ave · Christus HealthMay 1, 2025Cosmetic upgrades - urgent care — renovation/alteration — project consists of cosmetic upgrades of approximately 5,896 sq ft of ctmf - urgent care in tyler, texas · 134 m away
- 5627 S. Broadway Ave. Tyler, TX 75703 · Drake Management Services, LLCJan 26, 2026Tyler, tx — renovation/alteration — the scope of work includes installation of fixtures, furniture, and equipment, construction of interior partitions and doors, ceilings, finishes, and lighting in all areas, restroom fixtures and finishes, and a new kitchenette with a mop sink · 138 m away
- 320 E. Rieck Rd · American Red CrossApr 15, 2024Red cross office remodel — renovation/alteration — remodel of existing building · 245 m away
- 5201 S. Broadway Ave · Pyle PropertiesFeb 1, 2024Church of the pines — renovation/alteration — demolition pony walls and add all new walls. we will not be touching the existing bathrooms. they will be untouched other than paint · 284 m away
- 5308 Old Bullard · Rady Inc.Oct 11, 2024Shipley do-nut and retail — new construction — new single story do-nut store with drive-thru and one future tenant space · 343 m away
- 5875 Old Bullard Rd · Dal Riata LLCAug 14, 2025The brass tap — renovation/alteration — 2nd generation tenant finish out of existing restaurant into a new restaurant and bar. existing mechanical - most electrical to remain · 455 m away
- 5609 Donnybrook · C Swinney Investments. LLCOct 14, 2024Dialysis access asc — renovation/alteration — remodel building is a b-occupancy with offices, reception, dressing areas, storage, patient procedure spaces, and other support areas. remodel is 8000 sq ft · 526 m away
- 6000 S Broadway Ave · Lebco IndustriesSep 7, 2025La-z-boy renovation — renovation/alteration — 19,227gsf - showroom floor refresh with new finishes, paint and lighting layout · 577 m away