4400 College Drive
Vernon, TX 76384 · Vernon College
Vernon College residence halls slated for $1.6M in upgrades
Vernon College’s student housing residence center is undergoing renovations to its primary hall and baseball dormitory. The project was registered with TDLR on February 24, 2025, and includes new flooring, plumbing fixtures, lighting and other interior updates, plus select window glazing and HVAC work. The applicant estimated the project cost at $1.6 million.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 24, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 24, 2025
- since Feb 24, 2025
- Largest scope
- 27,368 sf
- Estimated cost
- $1.6M
- state registration
Where this project stands
CompletedResidence Hall Upgrades for Vernon College
27,368 sq ft · $1.6M est.
- RegisteredFeb 24, 2025
- Plan review
- ConstructionMar '25 – Aug '25
- Inspected
- Closed
Ran as a 5-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectAt both buildings, replace flooring, all plumbing fixtures, lighting, exhaust fans, switches, outlets, & door handles, accessible parking. replace select glazing in main dorm (22,440sf). replace hvac in baseball dormitory (4,928sf). — the student housing residence center (primary hall & baseball dorm)
TDLR project registrationRenovation/AlterationProject Closed27,368 sq ft$1.6M est.- Project #
- TABS2025012633
- Tenant / owner
- Residence Hall Upgrades For Vernon College
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4400 College Drive
What is being renovated at 4400 College Drive in Vernon?
Vernon College’s primary residence hall and baseball dormitory are listed for upgrades. The work includes flooring, plumbing fixtures, lighting, exhaust fans, switches, outlets and door handles.
When was the Vernon College residence hall project permitted?
The project was registered with the Texas Department of Licensing and Regulation on February 24, 2025. Its registration number is TABS2025012633.
How much will the Vernon College residence hall upgrades cost?
The TDLR registration lists an applicant-estimated cost of $1.6 million for the project.
What work is planned for the baseball dormitory at Vernon College?
The project description lists HVAC replacement in the 4,928-square-foot baseball dormitory, along with flooring, plumbing fixtures, lighting and other upgrades at both residence buildings.
What work is planned for the main Vernon College dorm?
The 22,440-square-foot main dorm is listed for select glazing replacement and upgrades including flooring, plumbing fixtures, lighting, exhaust fans, switches, outlets and door handles.
What is being renovated near McDonald's on Hillcrest Drive in Vernon?
Vernon College’s student residence halls at 4400 College Drive are listed for upgrades. The TDLR project registration was filed February 24, 2025; McDonald's is listed about 392 meters away.
Is there a project near Walmart on US Highway 287 in Vernon?
Vernon College’s residence hall upgrades at 4400 College Drive are about 445 meters from the Walmart property at 3800 US Highway 287 W. The college project was registered with TDLR on February 24, 2025.
Also being built nearby
All of 76384- 801 Hillcrest Drive · Mcdonald's Usa, LLCJul 25, 2024Mcdonald's (42-0442 sao-2) vernon — renovation/alteration — new customer service area layout, new restroom fixtures and finishes complying with ada standards, new seating and finishes at dining area per decor · 392 m away
- 1029 Hillcrest St · The Blessed LaundromatJul 15, 2026The blessed laundromat — renovation/alteration — 1700 sq ft · 426 m away
- 3800 US Highway 287 W · Wal-Mart Realty CompanyNov 20, 2025Walmart 3229-280 vernon, tx — additions to existing building — interior remodel with pain and signs. existing sq ft: 107,356 remodeled sq ft: 4,684 addition sq ft: 5,000 · 445 m away