3814 University Blvd

W. University Place, TX 77005 · City Of West University Place

West U plans Milton Street water line replacement

West University Place registered a project to replace a water line using trenchless and open-cut construction. The TDLR registration was filed March 24, 2025, and says the work includes replacing about 3,203 linear feet of sidewalk and ramps. The applicant's estimated project cost is $2,879,187; the registration lists the project as inspection complete.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 24, 2025

Projects
1
1 filings
Latest filing
Mar 24, 2025
since Mar 24, 2025
Largest scope
3,203 sf
Estimated cost
$2.9M
state registration

Where this project stands

Inspected · closing out

Milton Street Water Line Replacement

3,203 sq ft · $2.9M est.

  1. RegisteredMar 24, 2025
  2. Plan review
  3. ConstructionApr '25 – Dec '25
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Installation of new water line via trenchless and open cut construction. open cut construction of water line will require the removal and replacement of existing sidewalk and ramps. approximate area of sidewalk/ramp replacement is 3,203 lf. — n/a

    TDLR project registrationRenovation/AlterationInspection Complete3,203 sq ft$2.9M est.
    Tenant / owner
    Milton Street Water Line Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 3814 University Blvd

What is being built at 3814 University Blvd?

The City of West University Place registered the Milton Street Water Line Replacement project, which involves installing a new water line with trenchless and open-cut construction. The TDLR registration, TABS2025014896, was filed March 24, 2025.

Is there a new water line project near Cityrise West U Baptist Church?

Yes. The Milton Street Water Line Replacement project is listed at 3814 University Blvd, about 75 meters from Cityrise West U Baptist Church at 3831 Amherst Street. Its TDLR registration was filed March 24, 2025.

Will sidewalks be replaced as part of the Milton Street water line work?

The registration says open-cut construction will require removal and replacement of existing sidewalks and ramps. It gives the approximate replacement area as 3,203 linear feet.

How much will the West U water line project cost?

The applicant's TDLR estimate for the project is $2,879,187. This is an estimate, not a final reported project cost.

What is the status of the Milton Street Water Line Replacement?

The TDLR registration lists the project status as inspection complete. The registration was filed March 24, 2025, under project number TABS2025014896.