1425 S 7th St, Waco TX
Waco, TX 76706 · Baylor University
Baylor plans Memorial Dining Hall renovation in Waco
Baylor University registered an interior renovation of the existing Memorial Dining Hall at 1425 S 7th St. The TDLR filing, dated January 13, 2026, describes work on the first floor of a three-story building across about 22,000 square feet. The applicant estimates the project cost at $2.8 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 13, 2026
- since Jan 13, 2026
- Largest scope
- 22,000 sf
- Estimated cost
- $2.8M
- state registration
Where this project stands
Finishing up · inspection nextBaylor Univeristy 1845 Memorial Remodel
22,000 sq ft · $2.8M est.
- RegisteredJan 13, 2026
- Plan review
- ConstructionMay '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 28, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior renovation of an existing dining hall on the 1st floor of an existing 3-story building. — memorial dining hall
TDLR project registrationRenovation/AlterationReview Complete22,000 sq ft$2.8M est.- Project #
- TABS2026009967
- Tenant / owner
- Baylor Univeristy 1845 Memorial Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1425 S 7th St, Waco TX
What is being renovated at 1425 S 7th St in Waco?
A TDLR registration describes an interior renovation of Baylor’s existing Memorial Dining Hall on the first floor of a three-story building. The filing was dated January 13, 2026.
Is Baylor building a new dining hall at 1425 S 7th St?
The filing describes renovation of an existing dining hall, not new construction. The project registration is TABS2026009967.
How large is the Memorial Dining Hall renovation?
The TDLR filing lists the project at 22,000 square feet. It describes interior work on the first floor of the existing building.
How much will the Baylor dining hall renovation cost?
The applicant’s estimated project cost is $2.8 million, according to the TDLR registration dated January 13, 2026.
What is being renovated near Baylor University Pat Neff at 1320 South 7th St?
About 125 meters away, Baylor registered an interior renovation of the existing Memorial Dining Hall at 1425 S 7th St. The filing covers about 22,000 square feet.
What is the status of the Memorial Dining Hall renovation filing?
The TDLR record lists the status as “Review Complete.” It was registered on January 13, 2026, under project number TABS2026009967.
Also being built nearby
All of 76706- 1420 South 7th St · Baylor UniversityApr 3, 2024Bu draper classrooms 140, 143, 341, 347, 349, 351, & 353 renovations — renovation/alteration — renovations totaling 4,674 square feet (1st floor 1,191 & 3rd floor 3,483) generally including updates to finishes, lighting, and equipment in existing classrooms · 13 m away
- 1420 S. 7th St · Baylor UniversityMay 5, 2025Baylor draper 1st floor classroom 147 renovations — renovation/alteration — renovations of approximately 2,215 sq ft to classroom 147 · 13 m away
- 1320 South 7th St · Baylor UniversityMar 4, 2026Baylor university pat neff 2nd floor suite 213 renovation — renovation/alteration — renovation of existing baylor university office of general council office space - base bid: 1951 sq ft; additinal alternate scope is cosmetic · 125 m away
- 1320 S 7th Street · Baylor UniversityNov 11, 2024Baylor pat neff 2nd floor suite 225 renovations — renovation/alteration — renovations to 2890 sq ft of office space. some wall changes within the suite to create larger offices and finish updates · 125 m away
- 600 Speight Ave · Baylor UniversityApr 8, 2026Bu tidwell - garden level, 1st floor, & 2nd floor office renovations — renovation/alteration — renovations to the garden level of 1,148 square feet, renovations to the 1st floor of 215 square feet, and renovations to the 2nd floor of 242 square feet to create a classroom and offices · 231 m away
- 1410 S 5th Street · Baylor UniversityMay 18, 2026Bu morrison hall classroom updates — renovation/alteration — classroom renovations of approximately 15,000 square feet to the 1st floor of morrison hall, as well as approximately 1,000 square feet of office updates on the 2nd floor to accommodate the 1st floor construction scope · 245 m away
- 1311 South 5th Street · Baylor UniversityApr 13, 2026Bu bill daniel student center 3rd floor va one stop renovation — renovation/alteration — renovations of approximately 572 square feet on the 3rd floor of bdsc to create a 2 offices and a conference room for the va one stop program · 272 m away
- 500 Speight Ave · Baylor UniversityNov 9, 2026Baylor bobo spiritual life center- interior renovations — renovation/alteration — minor interior renovations totaling 5,460 sq ft · 305 m away
- 1110 South 7th Street · Baylor UniversityApr 15, 2025Baylor university kokernot hall renovation — renovation/alteration — interior renovations with new plan configurations for residence hall needs; all new mepfp systems; existing elevator will be modernized; minor building. enclosure upgrades; site includes accessibility upgrades · 344 m away
- 1410 South 4th St · Baylor UniversityApr 9, 2024Bu sid richardson garden level testing center renovations — renovation/alteration — renovations totaling 2,732 square feet converting two existing classrooms into 8 testing rooms along with 3 offices, a computer area, and a cubbies area · 376 m away
- 500 James Street · Seventh & James Baptist ChurchJan 28, 2026500 james avenue student housing — new construction — the scope of this project includes the new construction of a 7-story student housing project with 264 units, garage parking, and resident amenities. total 508,493sf · 390 m away
- 1214 S 4th St · Baylor UniversitySep 22, 2026Baylor- marrs mclean science building- stair tower decommission — renovation/alteration — removal of existing stair tower totaling approximately 225 square feet · 427 m away
More restaurants in 76706.