1000 Westbank Dr
West Lake Hills, TX 78746
Emergency power repairs permitted at 1000 Westbank Dr
An electrical permit for emergency power outage repairs in Building D, Unit 4, at 1000 Westbank Dr was filed on January 11, 2024. The City of Austin record lists the permit as final.
Summarized from City of Austin records · updated Jan 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 11, 2024
- since Jan 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled1000 westbank dr building d unit 4 emergency power outage repairs
- AppliedJan 11, 2024
- IssuedJan 11, 2024
- WorkJan '24 – Jan '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project1000 westbank dr building d unit 4 emergency power outage repairs
1000 westbank dr building d unit 4 emergency power outage repairs
City of Austin permitElectrical PermitFinal- Record
- 2024-003788 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1000 Westbank Dr
What work was permitted at 1000 Westbank Dr?
A City of Austin electrical permit lists emergency power outage repairs in Building D, Unit 4. It was filed January 11, 2024, under permit 2024-003788 EP.
When was the electrical permit filed at 1000 Westbank Dr?
The permit was filed January 11, 2024. Its recorded status is final.
Is a new building being constructed at 1000 Westbank Dr?
The available permit record describes emergency power outage repairs in Building D, Unit 4, not new construction.
What is being repaired near Baylor Scott and White Clinic - West Lake?
A permit at 1000 Westbank Dr, about 90 meters from Baylor Scott and White Clinic - West Lake, covers emergency power outage repairs in Building D, Unit 4.
What is permit 2024-003788 EP for?
It is a City of Austin electrical permit for emergency power outage repairs at 1000 Westbank Dr, Building D, Unit 4. The filing date is January 11, 2024.
Also being built nearby
All of 78746- 1001 Westbank Dr · Baylor Scott And White Clinic - West LakeMay 15, 2025Lab equipment replacement — renovation/alteration — existing space modification · 90 m away
- 1110 Westbank DrAug 29, 2024Request to disconnect etj - for a solar system to existing commercial only. address is located in the etj · 111 m away
- 950 Westbank DrAug 10, 2026Installing 166.38 dc-kw rooftop solar in the west lake hills jurisdictions · 116 m away
- 3821 Bee Cave RdMar 2, 2007Trinity episcopal school waterline extension · 150 m away
- 3700 Moon River RdSep 26, 2025Installation of sewer yard line and grinder pump · 237 m away
- 3600 Silver Hill CirJan 9, 2024Septic abandoned and tie to the city · 256 m away
- 3603 Silver Hill CirSep 30, 2024Cut over from septic to sewer. install grinder tank with discharge line to tap. pump and clean septic tank and backfill with clean fill · 257 m away
- 1205 Silver Hill DrDec 13, 2024Replacement of an existing water heater replace existing gas water heater · 281 m away
- 1207 Silver Hill DrAug 28, 202626kw generator and 200 amp service rated transfer switch · 283 m away
- 3612 Moon River RdSep 6, 2024Replacement of an existing water heater · 289 m away
- 1003 Beaver TrlMar 4, 2025Repipe unit b hot water side · 291 m away
- 915 Beaver TrlSep 5, 2025Request to disconnect: replace both panels like for like at duplex install car charger · 313 m away