Permit covers replacement of existing water heater
A City of Austin plumbing permit covers replacement of an existing water heater at 203 Westwood Ter. The permit was filed on December 8, 2025, and its status is Final.
Summarized from City of Austin records · updated Dec 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 8, 2025
- since Dec 8, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater replace existing water heater
- AppliedDec 4, 2025
- IssuedDec 8, 2025
- WorkDec '25 – Jan '26
- Final inspectionJan 8, 2026
Passed final inspection Jan 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater replace existing water heater
Replacement of an existing water heater replace existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-154062 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 203 Westwood Ter
What is happening at 203 Westwood Ter?
A plumbing permit covers replacing an existing water heater. The record does not describe other work.
When was the water heater replacement permitted?
The City of Austin permit was filed on December 8, 2025.
What is the permit number for 203 Westwood Ter?
The permit number is 2025-154062 PP.
Is the permit for 203 Westwood Ter final?
Yes. The City of Austin record lists permit 2025-154062 PP as Final.
What's happening near PNC Bank on Bee Cave Road?
At 203 Westwood Ter, about 172 meters from PNC Bank at 3633 Bee Cave Road, a permit covers replacement of an existing water heater. It was filed December 8, 2025.
Also being built nearby
All of 78746- 3652 Bee Cave RdAug 6, 2025Emergency replacement of damaged service per hyatt dunn · 166 m away
- 307 Westwood TerOct 21, 2025Replacement of an existing water heater outdoor tankless water heater · 169 m away
- 3633 Bee Cave Road · Pnc Bank, N.a.Mar 5, 2026Pnc bank - exterior ada improvements — renovation/alteration — exterior ada improvements for ada parking and accessible routing for pnc bank. converting asphalt pavement to concrete pavement for parking stall and access aisle · 172 m away
- 3633 Bee Cave RdMar 30, 2026We will be installing a manual transfer switch which allows customer to connect a temporary generator during extended outages. the transfer switch is to be installed after the existing service disconnect which is to remain. the mts does have a mechanical interlock that prevents the generator from backfeeding the utility power. we will not be installing a permanent generator · 172 m away
- 3663 Bee Cave RdSep 27, 2024Gday we need to upgrade the existing 200amp service to 225amp per the new plans and remodel the bakery. this is a service upgrade and coa permit only as the work/job is in the city of westlake. i have a signed approved espa from ae and this does not require ae design per darren vicknair · 177 m away
- 308 Westwood TerMay 30, 2024Replacement of an existing water heaters (2) in garage · 203 m away
- 201 Westbrook DrAug 15, 2025Install new 9.350 kw rooftop solar system and 20khw energy storage system for existing residential only · 206 m away
- 302 Briarwood TrlFeb 26, 2024Homebuilder loop for sfr permit ref#: 2024-020167 ep · 223 m away
- 3520 Bee Caves Road · American BankApr 1, 2024American bank - westlake hills second floor office addition — renovation/alteration — remodeling 3 office spaces on the second floor · 225 m away
- 309 Laurelwood TrlOct 15, 2026Tpole for new construction · 250 m away
- 401 Westwood TerApr 22, 2026Install new 200 amp service to residence · 276 m away
- 3736 Bee Caves Road · Sibco LLC A Delaware Ltd Liability Co Dba The ForumSep 10, 2024The austin epicure — renovation/alteration — tenant finish out for food establishment, pick up and delivery only, no dine in, facility. common use staff restrooms are located in the building · 280 m away