301 Laurel Valley Rd
West Lake Hills, TX 78746
301 Laurel Valley Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 301 Laurel Valley Rd, West Lake Hills, TX 78746. The most recent, filed November 27, 2023, covers: “Install level 2 ev charger per austin energys plug-in rebate guidelines”.
Compiled from City of Austin records · updated Nov 27, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 27, 2023
- since Nov 27, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger per austin energys plug-in rebate guidelines
- AppliedNov 21, 2023
- IssuedNov 27, 2023
- WorkNov '23 – May '24
- Final inspectionJan 11, 2024
Passed final inspection Jan 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger per austin energys plug-in rebate guidelines
Install level 2 ev charger per austin energys plug-in rebate guidelines
City of Austin permitElectrical PermitFinal- Record
- 2023-150572 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 301 Laurel Valley Rd
What is being built at 301 Laurel Valley Rd?
The latest filing (City of Austin permit 2023-150572 EP, November 27, 2023) covers install level 2 ev charger per austin energys plug-in rebate guidelines.
How many permits and filings does 301 Laurel Valley Rd have?
1 filing across 1 project, from November 27, 2023 to November 27, 2023.
Is there other construction near 301 Laurel Valley Rd?
Yes. Nearby filings include 300 Laurel Valley Rd (install t pole, Jun 3, 2026); 304 Yaupon Valley Rd (disconnect - reconnect installation of new 26kw permanent whole home generator (propane) connected to house meter and main panel. no meter can required. (james bylander), Jan 26, 2024); 207 Yaupon Valley Rd (etj - 200 amp overhead temp power loop, May 5, 2025).
How do I get alerts for new permits at 301 Laurel Valley Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 300 Laurel Valley RdJun 3, 2026Install t pole · 51 m away
- 304 Yaupon Valley RdJan 26, 2024Disconnect - reconnect installation of new 26kw permanent whole home generator (propane) connected to house meter and main panel. no meter can required. (james bylander) · 76 m away
- 207 Yaupon Valley RdMay 5, 2025Etj - 200 amp overhead temp power loop · 144 m away
- 404 Ledgeway RidgeMay 26, 2026Relocate service from meter to rack build 350 amp stand alone overhead rack service from pole 380499 and removing pole 265378 and un numbered pole in the middle wo#715754 · 277 m away
- 301 Buckeye TrlSep 23, 2026Etj - upgrade service to 350-amp. build a new 350-amp service on the garage workshop addition with a 150-amp panel for the garage workshop and a 200-amp ats. refeed the existing 200-amp panel on the house from the 200-amp ats · 288 m away
- 106 Laurel Valley RdOct 19, 2026Base: installing a backup battery system and additional meter socket · 344 m away
- 405 Cedar Oak DrMay 8, 2024Temporary meter loop for new construction home · 401 m away
- 405 Buckeye TrlAug 31, 2026Rebuild the main service underground. install new meter can main breaker panel grounding surge protection. ae scheduled outage required · 451 m away
- 403 Skyline DrApr 15, 2024Install t-post · 458 m away
- 300 Skyline DrJan 4, 2024Request to disconnect existing 200 amp meter can installation of a 200 a ats · 484 m away
- 111 Skyline DrFeb 23, 2026Temporary power · 486 m away
- 407 Buckeye TrlAug 26, 2026Build overhead temporary electrical service to support construction of new sfh in etj · 505 m away