608 Brookhaven Trl
West Lake Hills, TX 78746
Roof-mounted solar system permitted at West Lake Hills home
City of Austin permits indicate a roof-mounted solar system was planned for an existing single-family home at 608 Brookhaven Trl on September 4, 2025. A second electrical permit, filed October 30, 2026, covers a utility disconnect and reconnect and lists a Tesla gateway.
Summarized from City of Austin records · updated Oct 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 30, 2026
- since Sep 4, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayEtj - utility disconnect/reconnect. tesla gateway. overhead service. ae. meter can does not need replacing- no espa attached
- AppliedOct 14, 2026
- IssuedOct 30, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsEtj - utility disconnect/reconnect. tesla gateway. overhead service. ae. meter can does not need replacing- no espa attached
Etj - utility disconnect/reconnect. tesla gateway. overhead service. ae. meter can does not need replacing- no espa attached
City of Austin permitElectrical PermitActive- Record
- 2026-135192 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new roof-mounted solar system to existing single family residence. underground ae
Install new roof-mounted solar system to existing single family residence. underground ae
City of Austin permitElectrical PermitActive- Record
- 2025-111713 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 608 Brookhaven Trl
What is being built at 608 Brookhaven Trl?
A City of Austin permit filed September 4, 2025, covers installation of a roof-mounted solar system on an existing single-family residence.
Is solar being installed at 608 Brookhaven Trl in West Lake Hills?
Yes. Permit 2025-111713 EP describes a new roof-mounted solar system for the existing home. The permit was filed September 4, 2025.
What electrical work is permitted at 608 Brookhaven Trl?
Permit 2026-135192 EP covers a utility disconnect and reconnect and lists a Tesla gateway. It was filed October 30, 2026.
When were permits filed for work at 608 Brookhaven Trl?
The solar permit was filed September 4, 2025, and the electrical disconnect/reconnect permit was filed October 30, 2026.
Is 608 Brookhaven Trl a new home project?
The solar permit describes work on an existing single-family residence. The listed permits cover solar installation and electrical work, not construction of a new home.
Also being built nearby
All of 78746- 608 Westbrook DrDec 10, 2024Request to disconnect for battery installation · 73 m away
- 602 Westbrook DrMar 28, 2026Upgrade aim electrical service · 78 m away
- 603 Brookhaven TrlFeb 10, 2025Schedule disconnect/reconnect with austn energy and reconfigure electrical service for solar and batteries · 87 m away
- 607 Westbrook DrJan 10, 2025Homebuilders loop [t-pole] etj no bp required · 111 m away
- 417 Honeycomb RidgeNov 10, 2025New service for sfr in etj · 133 m away
- 506 Brookhaven TrlFeb 24, 2026Temp power for remodel · 154 m away
- 509 Bee Tree CirApr 23, 2024Rebuild 350amp oh service build · 176 m away
- 616 Westbrook DrFeb 1, 2024Request to disconnect install 22kw generac generator and transfer switch · 179 m away
- 411 Honeycomb RidgeAug 27, 2024350 amp new service etj- austin energy · 204 m away
- 507 Bulian LnDec 12, 2025New service for sfr in etj · 218 m away
- 405 Honeycomb RidgeNov 1, 2024New construction in the etj sfr 350 amp · 295 m away
- 307 Blue Ridge TrlDec 7, 2023Install tesla solarglass solar roof to existing residence · 299 m away