78 Aragon Drive

Westlake, TX 76262 · B1 Bank Bldng - Level 2 Tenant Finish Out, B1 Bank - Tenant Finish Out

B1 Bank tenant finish-outs registered at 78 Aragon Drive

Two tenant interior finish-outs are planned in the existing multi-tenant building at 78 Aragon Drive in Westlake. TDLR registrations dated June 4 and June 18, 2026, describe work in a first-floor space and a roughly 4,480-square-foot Level 2 space, respectively.

Summarized from Texas Department of Licensing and Regulation records · updated Jun 18, 2026

Projects
2
2 filings
Latest filing
Jun 18, 2026
since Jun 4, 2026
Largest scope
4,480 sf
Estimated cost
$1.2M
state registration

Where this project stands

In state plan review

B1 Bank Bldng - Level 2 Tenant Finish Out

4,480 sq ft · $1.2M est.

  1. RegisteredJun 18, 2026
  2. Plan reviewnow
  3. ConstructionOct '26 – Jun '27
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. This is an approximately 4,480 sq ft tenant interior finish out of an existing building shell. the tenant space occupies level 2 of the building, and includes a lobby with access to the elevator and egress stair. — b1 bank building

    TDLR project registrationRenovation/AlterationProject Registered4,480 sq ft$1.2M est.
    Tenant / owner
    B1 Bank Bldng - Level 2 Tenant Finish Out
    Design firm
    Pro
    Contact
    Pro
  2. This is a 2300 sq ft tenant interior finish out of an existing building shell. the b1 bank tenant space occupies a portion of the 1st floor, and has multiple exit pathways. — b1 bank building

    TDLR project registrationRenovation/AlterationProject Registered2,300 sq ft$550K est.
    Tenant / owner
    B1 Bank - Tenant Finish Out
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 78 Aragon Drive

What is being built at 78 Aragon Drive in Westlake?

TDLR records describe two B1 Bank tenant interior finish-outs in the existing multi-tenant building, rather than a new building. The registrations were filed June 4 and June 18, 2026.

Is a new building being constructed at 78 Aragon Drive?

The TDLR records describe interior finish-out work in an existing building shell, not new building construction. They cover tenant spaces on the first and second floors.

What are the plans for the first floor at 78 Aragon Drive?

A June 4, 2026, TDLR registration describes a 2,300-square-foot B1 Bank tenant finish-out occupying part of the first floor. The project registration number is TABS2026022009.

What work is planned on Level 2 at 78 Aragon Drive?

A June 18, 2026, TDLR registration describes an approximately 4,480-square-foot tenant interior finish-out on Level 2, including a lobby with elevator and egress-stair access. The registration number is TABS2026023204.

When were the 78 Aragon Drive projects registered?

The first-floor finish-out was registered June 4, 2026, and the Level 2 finish-out was registered June 18, 2026, with the Texas Department of Licensing and Regulation.