4413 Kemp Blvd
Wichita Falls, TX 76308 · Ljs Opco Two, Llc.
Long John Silver’s rebuild planned at 4413 Kemp Blvd
A 2,247-square-foot Long John Silver’s is planned as a scrape-and-rebuild of the existing restaurant at 4413 Kemp Blvd. The TDLR project registration was filed June 6, 2024, and describes a new dumpster enclosure, curb work and parking changes. The applicant’s estimated project cost is $1.8 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 6, 2024
- since Jun 6, 2024
- Largest scope
- 2,247 sf
- Estimated cost
- $1.8M
- state registration
Where this project stands
Finishing up · inspection nextLong John Silver’s #70306
2,247 sq ft · $1.8M est.
- RegisteredJun 6, 2024
- Plan review
- ConstructionOct '24 – Mar '25
- Inspectednow
- Closed
Scheduled to finish Mar 3, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectProject entails a scrape and rebuild of an existing ljs into a new prototypical ljs, new prototypical dumpster enclosure. new dt, curb work and parking at the building due to difference in building footprint. — long john silvers
TDLR project registrationNew ConstructionReview Complete2,247 sq ft$1.8M est.- Project #
- TABS2024020201
- Tenant / owner
- Long John Silver’s #70306
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4413 Kemp Blvd
What is being built at 4413 Kemp Blvd?
A new 2,247-square-foot Long John Silver’s is planned to replace the existing restaurant. The TDLR registration also describes a new dumpster enclosure and changes to the curb and parking.
When was the Long John Silver’s project filed?
The TDLR project registration was filed June 6, 2024. It is listed as project TABS2024020201.
Is the Long John Silver’s at 4413 Kemp Blvd a new restaurant?
The registration describes scraping and rebuilding an existing Long John Silver’s as a new prototypical location. It does not give an opening date.
How much will the Long John Silver’s rebuild cost?
The applicant’s estimated cost for the project is $1.8 million. This is an estimate, not a confirmed final cost.
What’s being rebuilt near Vape Vibes Outlet 9 on Kemp Blvd?
A Long John Silver’s rebuild is registered at 4413 Kemp Blvd, about 143 meters from Vape Vibes Outlet 9 at 4500 Kemp Blvd. The project includes a new dumpster enclosure and curb and parking work.
What’s being built near Salon Fx on Kemp Blvd?
A 2,247-square-foot Long John Silver’s is planned at 4413 Kemp Blvd, about 278 meters from Salon Fx at 4520 Kemp Blvd. The TDLR registration describes a rebuild of the existing restaurant.
Also being built nearby
All of 76308- 4500 Kemp Blvd · Vape Vibes Outlet 9 LLCJul 6, 2026Vape vibes — new construction — interior finish out · 143 m away
- 4520 Kemp Blvd · Salon FxMay 14, 2026Salon fx — renovation/alteration — 800 sq ft finish out connected to existing space · 278 m away
- 4245 Kemp Blvd · Wichita Falls Equity LLCOct 7, 2026Burk royalty office remodel (suite 220) — renovation/alteration — remodel of approx 50% of existing lease space involving break room (millwork and sink relocation) and addition/remodel of open space and three existing office areas to add six private offices and modify the total number of open work spaces · 408 m away
- 2801 Southwest Parkway · Y&o Wf LLCJul 1, 2024Bealls 904 wichita falls tx — renovation/alteration — this 26,500 s.f. store will have new flooring, paint, new restrooms, lounge and computer room. the front entry will be revised with new storefront and new sliding doors. new lighting and new ceiling tiles will be installed · 598 m away