200 S Rosey Dodd Ave
Wink, TX 79789 · Wink-Loving ISD
Wink Loving ISD elementary school canopy and site work
A 1,900-square-foot exterior canopy addition, site repaving, and an exterior ramp are listed for Wink Loving ISD Elementary School at 200 S Rosey Dodd Ave. The TDLR project registration was filed on January 28, 2026, and lists the project status as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2026
- since Jan 28, 2026
- Largest scope
- 1,900 sf
- Estimated cost
- $900K
- state registration
Where this project stands
Inspected · closing outWink Loving ISD Elementary School Canopy
1,900 sq ft · $900K est.
- RegisteredJan 28, 2026
- Plan review
- ConstructionMay '26 – Sep '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 project1,900 sq ft of exterior canopy addition, site repaving, and an exterior ramp — wink loving isd
TDLR project registrationAdditions to Existing BuildingInspection Complete1,900 sq ft$900K est.- Project #
- TABS2026011130
- Tenant / owner
- Wink Loving ISD Elementary School Canopy
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 200 S Rosey Dodd Ave
What is being built at 200 S Rosey Dodd Ave in Wink?
A TDLR registration describes a 1,900-square-foot exterior canopy addition, site repaving, and an exterior ramp at Wink Loving ISD Elementary School. It was filed January 28, 2026.
When was the Wink Loving ISD elementary school project permitted?
The project was registered with TDLR on January 28, 2026. The registration lists its status as inspection complete.
How large is the canopy addition at Wink Loving ISD Elementary School?
The TDLR registration lists 1,900 square feet for the project, which includes the exterior canopy addition, site repaving, and an exterior ramp.
What is the estimated cost of the school canopy project in Wink?
The TDLR registration lists an estimated project cost of $900,000. This is the applicant's estimate.
What's being built near Wink-Loving ISD Student Services?
The elementary school project at 200 S Rosey Dodd Ave includes a 1,900-square-foot exterior canopy addition, site repaving, and an exterior ramp. Wink-Loving ISD Student Services is listed 174 meters away.
Is the Wink Loving ISD elementary school project complete?
The TDLR project registration lists the status as inspection complete. It was filed January 28, 2026.
Also being built nearby
All of 79789- 200 Rosey Dodd · Wink-Loving Independent School DistrictApr 14, 2025Wink-loving isd storage, weight & tennis — new construction — new storage facility, weight room addition, new tennis concession
- 200 Rosey Dodd Avenue · Wink-Loving Independent School DistrictApr 14, 2025Wink-loving isd stadium renovations — new construction — new elevator tower & bleachers, no parking
- 101 S Winkler Ave · Wink-Loving ISDApr 20, 2026Wink-loving isd student services — new construction — a new 1 story building with offices, a breakroom, classrooms, and storage · 174 m away
- 306 NW 2nd Street · Wink-Loving Independent School DistrictSep 10, 2024Wink aquatic center (site a) — new construction — pool restroom (2600 sq ft), leisure pool (4397 sq ft), slide pool with slide (1092 sq ft), pool concrete deck (11000 sq ft) · 339 m away
- 200 N, Rosey Dodd Ave · Wink Loving ISDJun 19, 2025Wlisd fine art addition — additions to existing building — storage space, support spaces, and loading dock for prop drop-off addition to existing auditorium facility · 480 m away
- 400 Wildcat Drive · Wink-Loving ISDOct 22, 2025Wink - loving isd recreation center renovations — renovation/alteration — the project consists a total of 86,108 sq ft renovation/addition of an auxiliary gym, locker rooms, office, and support spaces. renovation of the existing weight room, natatorium, and double-gym · 527 m away
- 401 N Wildcat Dr · Wink-Loving ISDJun 18, 2026Wlisd bbsb locker rooms — new construction — a new exterior dugout space for both baseball and softball with an attached locker room and restroom · 532 m away