209 S Danville Dr
Abilene, TX 79605 · Titan Towers LLC
1,500-square-foot office remodel at 209 S Danville Dr
A 1,500-square-foot office space at 209 S Danville Dr is being remodeled, according to a TDLR registration filed November 6, 2024. The work includes reconfiguring HVAC and electrical systems, replacing flooring, ceiling tiles and doors, and painting; the registration says no plumbing work is planned. The applicant’s estimated project cost is $79,000, and the record lists the project as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2024
- since Nov 6, 2024
- Largest scope
- 1,500 sf
- Estimated cost
- $79K
- state registration
Where this project stands
Inspected · closing outARMY 209
1,500 sq ft · $79K est.
- RegisteredNov 6, 2024
- Plan review
- ConstructionNov '24 – Feb '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRemodel 1500 sq ft office space, reconfigure hvac system & electrical to fit new layout. replace flooring, ceiling tile, doors & paint walls. no plumbing work — titan towers building c
TDLR project registrationRenovation/AlterationInspection Complete1,500 sq ft$79K est.- Project #
- TABS2025004958
- Tenant / owner
- Army 209
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 209 S Danville Dr
What is being built at 209 S Danville Dr in Abilene?
The TDLR record describes a remodel of 1,500 square feet of office space, not a new building. The listed work includes HVAC and electrical changes, new flooring, ceiling tiles and doors, and painting.
When was the office remodel at 209 S Danville Dr permitted?
The TDLR project registration, number TABS2025004958, was filed November 6, 2024.
How much will the 209 S Danville Dr office remodel cost?
The applicant’s estimated cost for the project is $79,000. This is an estimate, not a reported final cost.
Is the office remodel at 209 S Danville Dr complete?
The TDLR record lists the project status as “Inspection Complete.”
What work is planned at the office near City of Abilene on South First Street?
The project at 209 S Danville Dr is an office remodel about 483 meters from the City of Abilene location at 4595 South First St. The registration describes HVAC and electrical reconfiguration, flooring, ceiling tiles, doors and paint, with no plumbing work.
Also being built nearby
All of 79605- 4595 South First St · City Of AbileneMar 4, 2025Water utility additional offices city of abilene — renovation/alteration — renovation of the existing water utilities office - approx 850sf · 483 m away
- 4525 S. 3rd St · Tarpley Real Estate LLCMay 22, 2024Tarpley project — new construction — building a 3119 (conditioned) sq ft office space with a court yard and approximately 10,000 sq/ft of concrete parking lot/sidewalk · 516 m away
- 4585 S 1st St · Halle Properties LLCNov 4, 2025Discount tire #txw 09 — renovation/alteration — renovation of an existing discount tire location - sq ft 1,595 · 528 m away
- 309 S Pioneer Dr · Elsie Manor LPJun 10, 2024Elsie manor - borden manuf. building. multifamily remodel — renovation/alteration — remodel of existing borden manufacturing bld. &(2)other ancillary historic bldgs into 27 multifamily apartments (22,370+2,459+1,754=26,583sf) and (1) new 9-unit building @ 9,232sf · 570 m away
More offices in 79605.