309 S Pioneer Dr
Abilene, TX 79605 · Elsie Manor LP
Elsie Manor plans 36 apartments in Abilene
A project registered on June 10, 2024, calls for remodeling the former Borden manufacturing building and two other historic buildings into 27 apartments, plus constructing a new nine-unit building. The project registration lists 35,815 square feet and an applicant-estimated cost of $13.35 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 10, 2024
- since Jun 10, 2024
- Largest scope
- 35,815 sf
- Estimated cost
- $13M
- state registration
Where this project stands
In state plan reviewElsie Manor - Borden Manuf. Bldg. Multifamily Remodel
35,815 sq ft · $13M est.
- RegisteredJun 10, 2024
- Plan reviewnow
- ConstructionAug '24 – Dec '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRemodel of existing borden manufacturing bld. &(2)other ancillary historic bldgs into 27 multifamily apartments (22,370+2,459+1,754=26,583sf) and (1) new 9-unit building @ 9,232sf — elsie manor
TDLR project registrationRenovation/AlterationProject Registered35,815 sq ft$13M est.- Project #
- TABS2024020404
- Tenant / owner
- Elsie Manor - Borden Manuf. Bldg. Multifamily Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 309 S Pioneer Dr
What is being built at 309 S Pioneer Dr in Abilene?
The Elsie Manor project calls for 27 apartments in remodeled existing buildings and a new nine-unit building. The project was registered with TDLR on June 10, 2024.
How many apartments are planned at Elsie Manor?
The project description lists 27 apartments in the remodeled buildings and nine units in a new building, for 36 apartments total.
What was the Borden manufacturing building at 309 S Pioneer Dr used for?
The TDLR project description identifies it as the Borden manufacturing building. The registered project proposes remodeling it and two other historic buildings into apartments.
How much will the Elsie Manor project cost?
The TDLR registration lists an applicant estimate of $13.35 million for the project.
What's being built near Pioneer Drive Baptist Church in Abilene?
The Elsie Manor project at 309 S Pioneer Dr calls for 36 apartments: 27 in remodeled buildings and nine in a new building. Pioneer Drive Baptist Church is listed about 560 meters away.
When was the Elsie Manor project registered?
The project was registered with the Texas Department of Licensing and Regulation on June 10, 2024. Its registration number is TABS2024020404.
Also being built nearby
All of 79605- 4525 S. 3rd St · Tarpley Real Estate LLCMay 22, 2024Tarpley project — new construction — building a 3119 (conditioned) sq ft office space with a court yard and approximately 10,000 sq/ft of concrete parking lot/sidewalk · 211 m away
- 4585 S 1st St · Halle Properties LLCNov 4, 2025Discount tire #txw 09 — renovation/alteration — renovation of an existing discount tire location - sq ft 1,595 · 318 m away
- 4595 South First St · City Of AbileneMar 4, 2025Water utility additional offices city of abilene — renovation/alteration — renovation of the existing water utilities office - approx 850sf · 323 m away
- 4223 N 1st · Pak Harris Enterprises, LtdApr 14, 2026Cosmetology school — renovation/alteration — renovate existing building for new cosmetology school · 489 m away
- 701 S Pioneer Dr, Abilene, TX 79605 · Pioneer Drive Baptist ChurchMar 11, 2025Pioneer drive baptist church new worship building — additions to existing building — a new 2 story steel structure worship center addition to an existing church campus · 560 m away
- 209 S Danville Dr · Titan Towers LLCNov 6, 2024Army 209 — renovation/alteration — remodel 1500 sq ft office space, reconfigure hvac system & electrical to fit new layout. replace flooring, ceiling tile, doors & paint walls. no plumbing work · 570 m away
- 4001 S First St · Bolt, INCDec 12, 2024Arrow ford phase 4 — additions to existing building — adding on to existing service center · 577 m away
More apartments & multifamily in 79605, warehouses & industrial in 79605.