11801 Stoney Meadow Dr
Austin, TX 78617
11801 Stoney Meadow Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 11801 Stoney Meadow Dr, Austin, TX 78617. The most recent, filed March 2, 2007, covers: “Stoney ridge, phase b, sec 1”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 11801 Stoney Meadow Dr
What is being built at 11801 Stoney Meadow Dr?
The latest filing (City of Austin case 232078, March 2, 2007) covers stoney ridge, phase b, sec 1.
How many permits and filings does 11801 Stoney Meadow Dr have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
What is being built near Jsc Whitman Peterson Atx 130 in Austin?
11801 Stoney Meadow Dr is about 206 m from Jsc Whitman Peterson Atx 130 (7001 Elroy Rd). Its latest filing is for stoney ridge, phase b, sec 1.
Is there other construction near 11801 Stoney Meadow Dr?
Yes. Nearby filings include 7019 Elroy Rd (austin del valle fire & ems station, Oct 4, 2019); 11820 Savanna Canyon Ct (6ft tunnel to repair broken drain under foundation, Jul 29, 2026); 7001 Elroy Rd (c3 presents — renovation/alteration — interior office build out (2,793) in an existing building, Nov 8, 2026).
How do I get alerts for new permits at 11801 Stoney Meadow Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78617- 7019 Elroy RdOct 4, 2019Austin del valle fire & ems station · 119 m away
- 11820 Savanna Canyon CtJul 29, 20266ft tunnel to repair broken drain under foundation · 165 m away
- 7001 Elroy Rd · Jsc Whitman Peterson Atx 130 LLCNov 8, 2026C3 presents — renovation/alteration — interior office build out (2,793) in an existing building · 206 m away
- 7121 Elroy RdFeb 10, 2026Eplan: expedited review - new construction of a 1-story parking garage (1044 sq ft) · 208 m away
- 6813 Campina XingApr 17, 2026Replacement of complete existing central heat and air system with or without duct work 3.5 ton single stage gas unit · 227 m away
- 11832 Chambers Peak CvApr 10, 2024Leak repair tunnel dig we are creating an access point on the front right of the home. we will be tunneling underneath foundation (in the living room area) and excavate sewer to make repairs on broken fitting(s). we will proceed with excavation until we uncover the failed piping. once exposed we will conduct repairs and install hangers every 3 feet per code requirements to support the piping · 249 m away
- 7003-1/2 Ross RdJan 25, 2022Moore's crossing m.u.d. drainage improvements · 257 m away
- 6720 Campina XingNov 18, 2024Replacement of complete existing central heat and air system with or without duct work · 277 m away
- 6813 Panda Royle DrSep 18, 2026Base: installing a backup battery system and additional meter socket · 278 m away
- 12101 Stoney Meadow DrJul 7, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 281 m away
- 7014 Elroy RdMar 28, 2025Interior alteration to create secure vestibule that does not change overall square footage of building · 293 m away
- 11740 Gemmer StMay 29, 202616ft tunnel to repair broken drain under foundation · 297 m away