11832 Chambers Peak Cv
Austin, TX 78617
11832 Chambers Peak Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 11832 Chambers Peak Cv, Austin, TX 78617. The most recent, filed April 10, 2024, covers: “Leak repair tunnel dig we are creating an access point on the front right of the home. we will be tunneling underneath foundation (in the living room area) and excavate sewer to make repairs on broken fitting(s). we will proceed with excavation until we uncover the failed piping. once exposed we will conduct repairs and install hangers every 3 feet per code requirements to support the piping”.
Compiled from City of Austin records · updated Apr 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 10, 2024
- since Apr 10, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledLeak repair tunnel dig we are creating an access point on the front right of the home. we will be tunneling underneath foundation (in the living room area) and excavate sewer to make repairs on broken fitting(s). we will proceed with excavation until we uncover the failed piping. once exposed we will conduct repairs and install hangers every 3 feet per code requirements to support the piping
- AppliedApr 2, 2024
- IssuedApr 10, 2024
- WorkApr '24 – Apr '24
- Final inspectionApr 19, 2024
Passed final inspection Apr 19, 2024.
1 contact on this project
Permit & project history
1 projectLeak repair tunnel dig we are creating an access point on the front right of the home. we will be tunneling underneath foundation (in the living room area) and excavate sewer to make repairs on broken fitting(s). we will proceed with excavation until we uncover the failed piping. once exposed we will conduct repairs and install hangers every 3 feet per code requirements to support the piping
Leak repair tunnel dig we are creating an access point on the front right of the home. we will be tunneling underneath foundation (in the living room area) and excavate sewer to make repairs on broken fitting(s). we will proceed with excavation until we uncover the failed piping. once exposed we will conduct repairs and install hangers every 3 feet per code requirements to support the piping
City of Austin permitPlumbing PermitFinal- Record
- 2024-041386 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11832 Chambers Peak Cv
What is being built at 11832 Chambers Peak Cv?
The latest filing (City of Austin permit 2024-041386 PP, April 10, 2024) covers leak repair tunnel dig we are creating an access point on the front right of the home. we will be tunneling underneath foundation (in the living room area) and excavate sewer to make repairs on broken fitting(s). we will proceed with excavation until we uncover the failed piping. once exposed we will conduct repairs and install hangers every 3 feet per code requirements to support the piping.
How many permits and filings does 11832 Chambers Peak Cv have?
1 filing across 1 project, from April 10, 2024 to April 10, 2024.
Is there other construction near 11832 Chambers Peak Cv?
Yes. Nearby filings include 11809 Plains Valley Dr (install of roof mounted solar panels, May 28, 2024); 6713 Savanna Canyon Dr (add 5 new recessed lights to kitchen. use existing kitchen lighting circuit, Mar 19, 2024); 11820 Savanna Canyon Ct (6ft tunnel to repair broken drain under foundation, Jul 29, 2026).
How do I get alerts for new permits at 11832 Chambers Peak Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78617- 11809 Plains Valley DrMay 28, 2024Install of roof mounted solar panels · 73 m away
- 6713 Savanna Canyon DrMar 19, 2024Add 5 new recessed lights to kitchen. use existing kitchen lighting circuit · 80 m away
- 11820 Savanna Canyon CtJul 29, 20266ft tunnel to repair broken drain under foundation · 87 m away
- 6720 Campina XingNov 18, 2024Replacement of complete existing central heat and air system with or without duct work · 93 m away
- 6704 Campina XingFeb 23, 2026We will replace the section of pipe from the break to the homeowners clean out. our tunneling service provides safe efficient access beneath your property to repair or replace plumbing lines with minimal surface disruption. this service helps us ensure critical repairs are completed quickly and accurately · 123 m away
- 6813 Campina XingApr 17, 2026Replacement of complete existing central heat and air system with or without duct work 3.5 ton single stage gas unit · 148 m away
- 11816 Plains Valley DrAug 5, 2024Replacement of an existing water heater · 147 m away
- 12016 Plains Valley DrOct 28, 202475 tunnel to repair entire whole house drain system · 233 m away
- 6813 Panda Royle DrSep 18, 2026Base: installing a backup battery system and additional meter socket · 234 m away
- 11801 Stoney Meadow DrMar 2, 2007Stoney ridge, phase b, sec 1 — stoney ridge, phase b, sec 1 · 249 m away
- 6812 Plains Crest DrSep 14, 2026Express: foundation repair installing 22 steel piers · 294 m away
- 12101 Stoney Meadow DrJul 7, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 328 m away