Clarius Industrial site plan approved in Austin
An industrial project called Clarius Industrial is planned at 6005 FM 973 Rd in Austin. The City of Austin approved its site plan on October 26, 2026, under case 13783617; the record does not list a building size or construction schedule.
Summarized from City of Austin records · updated Oct 26, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Oct 26, 2026
- since Jun 13, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 6005 FM 973 Rd
What is being planned at 6005 FM 973 Rd in Austin?
City of Austin records identify Clarius Industrial, an industrial project, at this address. Its site plan was approved on October 26, 2026, under case 13783617.
Is the Clarius Industrial project approved?
The City of Austin case for Clarius Industrial is listed as “CC Approved.” The site plan case, 13783617, is dated October 26, 2026.
How large will Clarius Industrial be?
The available City of Austin record does not list a square-footage figure for Clarius Industrial.
When will construction start at 6005 FM 973 Rd?
The available records do not give a construction start date or schedule. They show the Clarius Industrial site plan was approved on October 26, 2026.
What is being built near Austin Airpark 130 Phase 02-Building 2?
Clarius Industrial is planned at 6005 FM 973 Rd, about 216 meters from the Austin Airpark 130 Phase 02-Building 2 landmark listed in the records. The records identify these as separate projects.
What happened to the Clarius Elroy subdivision case?
The City of Austin lists the Clarius Elroy subdivision case, 13133813, as expired. It was filed on June 13, 2023.
Also being built nearby
All of 78617- 6005 S. FM 973 Rd · Clarius PartnersMay 21, 2024Biel spec office -suite 1a — renovation/alteration — architecture and mep design for a 2923 sq ft spec office , and mep finish out of a 167,231 sq ft warehouse space for previously designed shell building · 201 m away
- 6005 S. FM 973 Rd,suite 3 · Clarius PartnersMay 21, 2024Biel spec office-suite 3 — renovation/alteration — architecture and mep design for a 2612 of spec office and mep finish-out of a 143,530 sq ft warehouse space for previously designed shell buildings · 201 m away
- 6005 S. FM 973 Rd,suite 1b · W-C Cpb Owner Ix LPMay 19, 2026Airpark 130 bld1 01 demising wall — renovation/alteration — architecture and mep design for a demising wall. no other work being done · 201 m away
- 6005 S.fm 973 Rd,suite 4 · Clarius PartnersMay 21, 2024Biel spec office-suite 4 — renovation/alteration — architecture and mep design for 2612sf spec office and mep finish-out of a 123,028sf warehouse space for previously designed shell building · 201 m away
- 6025 S. F.m 973 Rd,suite 1a · W-C Cpb Owner Ix LPOct 30, 2026Clarius- standard electron — renovation/alteration — architectural and mep design for a new fence location, demising wall, hvls fans and warehouse exhaust only approx 57,698.22sf no other work being done · 213 m away
- 6025 S FM 973 Rd · W-C Cpb Owner Ix LPOct 2, 2026Austin airpark 130 phase 02-building 2 — renovation/alteration — ground up tilt wall building approx 168,660 · 218 m away
- 6025 FM 973 RdNov 6, 2026Clarius industrial · 219 m away
- 5615 FM 973 RdJan 9, 2026130 rv storage & warehouse (with r sp-2018-0311d) · 353 m away
- 5615 S FM 973 Rd · Hfp Oz Holdings, LPOct 19, 2026[etj] permanent electrical for masons meats · 356 m away
- 5615 S FM 973 Rd · Hpf Oz Holdings, LPJul 21, 2026Bcei finish out — renovation/alteration — finish-out of break room, showers, and upgrade to interior lighting. fork lift ramp modifications · 398 m away
- 5615 S FM 973 · Hfp Oz Holdings, LPApr 14, 2026Mason's meats — renovation/alteration — tenant finish out of existing office/ warehouse spec suite · 398 m away
- 6348 Elroy Rd · Building 02 ShellSep 14, 2026Stream elroy & 130 · 547 m away