5615 S FM 973
Del Valle, TX 78617 · Hfp Oz Holdings, LP
Mason’s Meats tenant finish-out at 5615 S FM 973
A 9,334-square-foot tenant finish-out for Mason’s Meats is registered for an existing office and warehouse suite at 5615 S FM 973 in Del Valle. The Texas Department of Licensing and Regulation record was filed April 14, 2026, and lists an estimated project cost of $950,000.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 14, 2026
- since Apr 14, 2026
- Largest scope
- 9,334 sf
- Estimated cost
- $950K
- state registration
Where this project stands
Finishing up · inspection nextMason's Meats
9,334 sq ft · $950K est.
- RegisteredApr 14, 2026
- Plan review
- ConstructionMay '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 3, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectTenant finish out of existing office/ warehouse spec suite. — the hangars
TDLR project registrationRenovation/AlterationReview Complete9,334 sq ft$950K est.- Project #
- TABS2026017607
- Tenant / owner
- Mason's Meats
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5615 S FM 973
What is being built at 5615 S FM 973 in Del Valle?
A tenant finish-out for Mason’s Meats is planned for an existing office and warehouse suite. The TDLR registration describes a 9,334-square-foot renovation and alteration, filed April 14, 2026.
What is going into 5615 S FM 973?
The project is a tenant finish-out for Mason’s Meats in an existing office and warehouse suite. The record does not specify further details about the space’s use.
When was the Mason’s Meats project filed?
The TDLR project registration was filed April 14, 2026. Its ID is TABS2026017607.
How large is the Mason’s Meats finish-out in Del Valle?
The registered project covers 9,334 square feet of an existing office and warehouse spec suite.
How much will the Mason’s Meats project cost?
The TDLR registration lists an applicant-estimated cost of $950,000 for the project.
What is being built near Heartland Acoustics at The Hangars?
At 5615 S FM 973, the TDLR record lists a tenant finish-out for Mason’s Meats in an existing office and warehouse suite. Heartland Acoustics at The Hangars is listed 63 meters away at the same address.
Also being built nearby
All of 78617- 5615 S FM 973 Rd · Hpf Oz Holdings, LPJul 21, 2026Bcei finish out — renovation/alteration — finish-out of break room, showers, and upgrade to interior lighting. fork lift ramp modifications
- 5615 S FM 973 Rd · Hfp Oz Holdings, LPOct 19, 2026[etj] permanent electrical for masons meats · 77 m away
- 5615 FM 973 RdJan 9, 2026130 rv storage & warehouse (with r sp-2018-0311d) · 84 m away
- 6005 FM 973 RdOct 26, 2026Clarius industrial · 398 m away
- 6005 S. FM 973 Rd · Clarius PartnersMay 21, 2024Biel spec office -suite 1a — renovation/alteration — architecture and mep design for a 2923 sq ft spec office , and mep finish out of a 167,231 sq ft warehouse space for previously designed shell building · 461 m away
- 6005 S. FM 973 Rd,suite 3 · Clarius PartnersMay 21, 2024Biel spec office-suite 3 — renovation/alteration — architecture and mep design for a 2612 of spec office and mep finish-out of a 143,530 sq ft warehouse space for previously designed shell buildings · 461 m away
- 6005 S. FM 973 Rd,suite 1b · W-C Cpb Owner Ix LPMay 19, 2026Airpark 130 bld1 01 demising wall — renovation/alteration — architecture and mep design for a demising wall. no other work being done · 461 m away
- 6005 S.fm 973 Rd,suite 4 · Clarius PartnersMay 21, 2024Biel spec office-suite 4 — renovation/alteration — architecture and mep design for 2612sf spec office and mep finish-out of a 123,028sf warehouse space for previously designed shell building · 461 m away
- 5305 FM 973 RdApr 9, 2020Fm 973 north pit fill · 467 m away
- 6025 S. F.m 973 Rd,suite 1a · W-C Cpb Owner Ix LPOct 30, 2026Clarius- standard electron — renovation/alteration — architectural and mep design for a new fence location, demising wall, hvls fans and warehouse exhaust only approx 57,698.22sf no other work being done · 483 m away
- 6025 S FM 973 Rd · W-C Cpb Owner Ix LPOct 2, 2026Austin airpark 130 phase 02-building 2 — renovation/alteration — ground up tilt wall building approx 168,660 · 522 m away
- 6025 FM 973 RdNov 6, 2026Clarius industrial · 524 m away