Kellam Road Apartments site plan approved in Austin
A site plan for the Kellam Road Apartments project at 6120 Circuit of the Americas Blvd was approved and released on October 25, 2024. The City of Austin record identifies it as an apartment project but does not list its size or construction schedule.
Summarized from City of Austin records · updated Oct 25, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 25, 2024
- since Oct 25, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 6120 Circuit Of The Americas Blvd
What is being planned at 6120 Circuit of the Americas Blvd?
A City of Austin site-plan case identifies an apartment project called Kellam Road Apartments at this address. The case was approved and released on October 25, 2024.
What are the Kellam Road Apartments?
They are an apartment project listed in a City of Austin site-plan case, case 13155451. The record does not provide a unit count or building size.
When was the Kellam Road Apartments site plan approved?
The City of Austin case was approved and released on October 25, 2024.
Has construction started on Kellam Road Apartments?
The available record documents an approved and released site plan, but does not say whether construction has started.
How many apartments are planned at 6120 Circuit of the Americas Blvd?
The City of Austin record does not specify the number of apartments.
Also being built nearby
All of 78617- 6007-1/2 Circuit Of The Americas BlvdAug 27, 2024Longview, phase 1 amended plat of block 41, lots 12, 17, 18, 22; block 42, lot 23; and block 30, lots 23, 24 · 288 m away
- 6001 Randleman DrOct 20, 2026Express: foundation repair (install 11 steel hybrid piers) · 308 m away
- 6025 Randleman DrSep 10, 2026Spot repair of approximately 10 ft of existing sewer line. repair to be completed by tunneling beneath the existing structure · 328 m away
- 6029 Randleman DrNov 13, 2026Installation of energy storage system into existing solar panel system. in order to interconnect the ess equipment and perform a whole home backup for all customer loads we will need to schedule a meter pull so that the backup switch can be integrated to the existing utility meter · 331 m away
- 13416 Guarnere DrAug 12, 2024Replacement of complete existing central heat and air system with or without duct work · 336 m away
- 5717 War Admiral DrNov 30, 2023Express: foundation repair · 342 m away
- 13505-1/2 Muck DrMar 11, 2026Moores crossing · 345 m away
- 13413 Guarnere DrOct 15, 2026Installation of a 8.2kw dc solar system · 354 m away
- 6016 Beverly Prairie RdMay 17, 2024New irrigation system - etj · 362 m away
- 6024 Randleman DrDec 1, 2025Hill - 39-11430 - install new 5.11kw rooftop solar system to existing residential only using backfed breaker · 374 m away
- 6012 Beverly Prairie RdMay 17, 2024New irrigation system- etj · 378 m away
- 6008 Beverly Prairie RdDec 19, 2024Installation of 18 rec solar panels with 18 enphase microinverters · 396 m away