16400 Moonlit Path
Austin, TX 78653
Whisper Valley Parcel 4 multifamily site plans filed
City of Austin records show site-plan filings for a proposed multifamily project at 16400 Moonlit Path, identified as Whisper Valley Multifamily Parcel 4. The first case was filed September 16, 2024, and withdrawn; a related case filed October 25, 2025, is marked expired.
Summarized from City of Austin records · updated Oct 25, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 25, 2025
- since Sep 16, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 16400 Moonlit Path
What is being built at 16400 Moonlit Path?
City of Austin records show site-plan cases for Whisper Valley Multifamily Parcel 4, an apartment project. The records do not confirm that construction is underway.
Is there a new apartment project planned for 16400 Moonlit Path?
The site-plan filings identify a multifamily project for Parcel 4. The September 16, 2024 case was withdrawn, and the October 25, 2025 case is marked expired.
Has the Whisper Valley Parcel 4 project been approved?
The available City of Austin records list site-plan cases but do not show an approval. One case is marked withdrawn and the later case is marked expired.
What are the case numbers for the Moonlit Path apartment project?
The case numbers are 13205198, filed September 16, 2024, and 13401361, filed October 25, 2025. The first is marked withdrawn and the second expired.
When were plans filed for Whisper Valley Multifamily Parcel 4?
City of Austin records show filings on September 16, 2024, and October 25, 2025. The filings are site-plan cases.
Also being built nearby
All of 78653- 16505 Summery StDec 18, 20232 access holes in dirt 80 feet of tunnel to repair leaks and backfall in sewer system · 131 m away
- 16305 Fetching AveNov 17, 2025Repairing conduit for service. adding 2 ground rods and surge protection · 202 m away
- 16528 Summery StOct 16, 2024Adding 2 double-gang outlets along one wall. i will be tying into an existing outlet opening the drywall to run the line through the studs to their locations under 10 feet away. the circuit will be gfci protected · 252 m away
- 16417 Sumptuous DrNov 1, 2024Utility: bbec. solar and battery installation. will need a temporary electric shutdown for electrical repairs · 288 m away
- 9900 Becoming StSep 29, 2025Express: replace two windows like for like · 329 m away
- 16300-1/2 Fetching AveJan 13, 2025Whisper valley multifamily parcel 3(with r sp-2023-0400c) · 338 m away
- 16532 Fetching AveSep 9, 2026124 tunnel below the foundation to replace entire pvc drain system. 3 access holes - right front left · 345 m away
- 9912 Comely BndOct 1, 2024Install new roof-mounted solar and energy storage system to existing single family residence. underground. bluebonnet · 363 m away
- 9809 Chirpy WayJul 23, 2025Slab penetration in garage and 5 tunnel to repair breaks on dual sewer mains under garage floor and delete broken clean out. install main line pvc double clean outs and 80 tunnel below the foundation to repair entire pvc drain system · 369 m away
- 9920 Comely BndApr 10, 2026Request for disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required. ess installation. utility is bbec · 378 m away
- 9920 Becoming StAug 14, 2026Install new roof-mounted solar system and energy storage syste to existing residence. bluebonnet · 382 m away
- 9913 Becoming StMar 3, 2025Replacement of an existing water heater standard 40 gal electric · 388 m away