1300 Coronation Way
Austin, TX 78660
Backup battery system permitted at 1300 Coronation Way
A City of Austin electrical permit filed October 19, 2026, lists a backup battery system and additional meter socket at 1300 Coronation Way. An earlier electrical permit, finalized January 28, 2025, covered an underground main service upgrade from 125 to 225.
Summarized from City of Austin records · updated Oct 19, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 19, 2026
- since Jan 28, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBase: installing a backup battery system and additional meter socket
- AppliedSep 29, 2026
- IssuedOct 19, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-128414 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrade underground main service from 125 to 225
Upgrade underground main service from 125 to 225
City of Austin permitElectrical PermitFinal- Record
- 2025-008079 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1300 Coronation Way
What is being built at 1300 Coronation Way?
A City of Austin electrical permit lists installation of a backup battery system and an additional meter socket. The permit, 2026-128414 EP, was filed October 19, 2026.
Is a new building going up at 1300 Coronation Way?
The available records list electrical work, not a new building: a backup battery system and additional meter socket.
When was the backup battery permit filed at 1300 Coronation Way?
Permit 2026-128414 EP was filed with the City of Austin on October 19, 2026. Its status is listed as Active.
What electrical work was permitted at 1300 Coronation Way in 2025?
Permit 2025-008079 EP covered an upgrade to the underground main service from 125 to 225. It was filed January 28, 2025, and is listed as Final.
Are there multiple projects listed at 1300 Coronation Way?
Yes. The City of Austin records show two electrical permits: one for a service upgrade in 2025 and one for a backup battery system and additional meter socket in 2026.
Also being built nearby
All of 78660- 14800 Hyson XingOct 3, 2025Installation of a 6.88 solar panel system with 16 roof mounted solar system and 1 solaredge inverter · 284 m away
- 1605 Darjeeling DrSep 16, 2024Replace 200a meter base and make repairs to feeder pipe that has separated from equipment · 293 m away
- 15304 Hyson XingJan 22, 2024Installation of a generator and automatic transfer switch with service upgrade · 306 m away
- 1201 Tea Leaf DrFeb 2, 2009Gaston sheldon sec 4, amending plat of lots 19-25, block l — gaston sheldon section 4, amending plat of lots 19-25, block l · 355 m away
- 905 Sweet Leaf LnJun 22, 2026Main and sub panel change out · 362 m away
- 1307 St Croix LnJan 28, 2025Request to disconnect and reconnect to install a generator with a 100 amp ats · 368 m away
- 14609 Hyson XingJan 27, 2024Request to disconnect contractor disconnect program request to upgrade existing underground service to 200 amp using existing meter base · 403 m away
- 14805 Earl Grey LnMay 11, 2026General work on existing solar system. no other work being performed · 439 m away
- 900 Tudor House RdMar 2, 2007Pflugerville i.s.d brookfield elementary · 494 m away
- 15024 Sassafras TrlSep 11, 2026Armstrong - 40-12388 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 200 amp main breaker. upgrading revenue meter to 200 amps. underground service requesting wire pull · 514 m away
- 14708 Earl Grey LnNov 6, 2025Install new 5.220 kw rooftop solar system and 13.5 kw energy storage system for existing residential only · 526 m away
- 904 Sally Lunn WayMay 29, 2025Replacement of an existing water heater 40h nat gas water heater replacement **austin 2 mile etj · 539 m away