1508 Kandinsky Bnd
Austin, TX 78660
1508 Kandinsky Bnd: 1 project on record
City of Austin lists 1 filing across 1 project at 1508 Kandinsky Bnd, Austin, TX 78660. The most recent, filed May 28, 2024, covers: “Install evse”.
Compiled from City of Austin records · updated May 28, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 28, 2024
- since May 28, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedMay 22, 2024
- IssuedMay 28, 2024
- WorkMay '24 – May '24
- Final inspectionMay 31, 2024
Passed final inspection May 31, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2024-064688 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1508 Kandinsky Bnd
What is being built at 1508 Kandinsky Bnd?
The latest filing (City of Austin permit 2024-064688 EP, May 28, 2024) covers install evse.
How many permits and filings does 1508 Kandinsky Bnd have?
1 filing across 1 project, from May 28, 2024 to May 28, 2024.
Is there other construction near 1508 Kandinsky Bnd?
Yes. Nearby filings include 1510 Kandinsky Bnd (replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system and ductwork, May 14, 2026); 1511 Kandinsky Bnd (installing 1 car ev charger station inside garage that includes up to 15 feet from the electrical panel. all electrical wiring included, Sep 10, 2025); 14506 Frankel Loop (not pre-plumbed water softener install, Jan 22, 2026).
How do I get alerts for new permits at 1508 Kandinsky Bnd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78660- 1510 Kandinsky BndMay 14, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system and ductwork · 16 m away
- 1511 Kandinsky BndSep 10, 2025Installing 1 car ev charger station inside garage that includes up to 15 feet from the electrical panel. all electrical wiring included · 29 m away
- 14506 Frankel LoopJan 22, 2026Not pre-plumbed water softener install · 62 m away
- 14611 Frankel LoopAug 20, 2024Disconnect/reconnect to install a 6.23kw solar panel system · 106 m away
- 14110 Dessau RdJul 12, 2016Fort dessau phase 3 · 172 m away
- 1401 Anhalt DrSep 3, 2024(kakade vishaal) - installation of circuit for elec. vehicle charging station - esip · 240 m away
- 1513 Tudor House RdDec 19, 2023Install 37 (405w) roof mounted solar panels. 14.985 kw solar service system tying into existing 125 amp main service panel · 268 m away
- 1521 Tudor House RdAug 20, 2009Gaston-sheldon sec 1 (plat vacation) — gaston sheldon section one-a - plat vacation · 279 m away
- 14214-1/2 Dessau RdMay 15, 2020Northtown municipal utility district force main replacement · 297 m away
- 1517 Maier DrFeb 26, 2026Gas test to get the gas turned back on · 298 m away
- 14133 Sumatra LnMar 2, 2007Gaston/sheldon subdivision, section one-a, replat of lots 21-25 block g & lot 3 — gaston/sheldon subdivision, section one-a, replat of lots 21-25 block g & lot 3 block f, section one · 314 m away
- 1521 Fort Dessau RdApr 5, 2024Express: bathroom remodel-replace shower in master bath · 372 m away