1510 Kandinsky Bnd
Austin, TX 78660
Replacement 3-ton AC system permitted at 1510 Kandinsky Bnd
A replacement 3-ton air-conditioning system and ductwork were permitted at 1510 Kandinsky Bnd on May 14, 2026. The City of Austin permit describes replacing the existing central heat and air system; its status is Final.
Summarized from City of Austin records · updated May 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2026
- since May 14, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system and ductwork
- AppliedMay 11, 2026
- IssuedMay 14, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 10, 2026
Passed final inspection Jun 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system and ductwork
Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system and ductwork
City of Austin permitMechanical PermitFinal- Record
- 2026-058590 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1510 Kandinsky Bnd
What work was permitted at 1510 Kandinsky Bnd?
A City of Austin mechanical permit covers replacement of the existing central heat and air system, including a 3-ton AC system and ductwork. The permit is 2026-058590 MP.
When was the permit for 1510 Kandinsky Bnd filed?
The permit was filed on May 14, 2026.
Is a new building being built at 1510 Kandinsky Bnd?
The available record is for replacing an existing central heat and air system, not for constructing a new building.
Does the 1510 Kandinsky Bnd permit include ductwork?
Yes. The permit description includes installation of a replacement 3-ton AC system and ductwork.
What is the status of the 1510 Kandinsky Bnd permit?
City of Austin permit 2026-058590 MP is listed as Final.
Also being built nearby
All of 78660- 1508 Kandinsky BndMay 28, 2024Install evse · 16 m away
- 1511 Kandinsky BndSep 10, 2025Installing 1 car ev charger station inside garage that includes up to 15 feet from the electrical panel. all electrical wiring included · 27 m away
- 14506 Frankel LoopJan 22, 2026Not pre-plumbed water softener install · 78 m away
- 14611 Frankel LoopAug 20, 2024Disconnect/reconnect to install a 6.23kw solar panel system · 112 m away
- 14110 Dessau RdJul 12, 2016Fort dessau phase 3 · 156 m away
- 1401 Anhalt DrSep 3, 2024(kakade vishaal) - installation of circuit for elec. vehicle charging station - esip · 249 m away
- 1513 Tudor House RdDec 19, 2023Install 37 (405w) roof mounted solar panels. 14.985 kw solar service system tying into existing 125 amp main service panel · 261 m away
- 1521 Tudor House RdAug 20, 2009Gaston-sheldon sec 1 (plat vacation) — gaston sheldon section one-a - plat vacation · 270 m away
- 14214-1/2 Dessau RdMay 15, 2020Northtown municipal utility district force main replacement · 286 m away
- 1517 Maier DrFeb 26, 2026Gas test to get the gas turned back on · 300 m away
- 14133 Sumatra LnMar 2, 2007Gaston/sheldon subdivision, section one-a, replat of lots 21-25 block g & lot 3 — gaston/sheldon subdivision, section one-a, replat of lots 21-25 block g & lot 3 block f, section one · 321 m away
- 1521 Fort Dessau RdApr 5, 2024Express: bathroom remodel-replace shower in master bath · 376 m away