1003 W Martin Luther King Jr Blvd
Austin, TX 78701
1003 W Martin Luther King Jr Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 1003 W Martin Luther King Jr Blvd, Austin, TX 78701. The most recent, filed July 19, 2024, covers: “Emergency fix. 1003 w mlk jr blvd apt b. receptacle was added into apt a garage and was back feeding into apt b phase”.
Compiled from City of Austin records · updated Jul 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 19, 2024
- since Jul 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEmergency fix. 1003 w mlk jr blvd apt b. receptacle was added into apt a garage and was back feeding into apt b phase
- AppliedJul 17, 2024
- IssuedJul 19, 2024
- WorkJul '24 – Jul '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectEmergency fix. 1003 w mlk jr blvd apt b. receptacle was added into apt a garage and was back feeding into apt b phase
Emergency fix. 1003 w mlk jr blvd apt b. receptacle was added into apt a garage and was back feeding into apt b phase
City of Austin permitElectrical PermitFinal- Record
- 2024-088619 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1003 W Martin Luther King Jr Blvd
What is being built at 1003 W Martin Luther King Jr Blvd?
The latest filing (City of Austin permit 2024-088619 EP, July 19, 2024) covers emergency fix. 1003 w mlk jr blvd apt b. receptacle was added into apt a garage and was back feeding into apt b phase.
How many permits and filings does 1003 W Martin Luther King Jr Blvd have?
1 filing across 1 project, from July 19, 2024 to July 19, 2024.
What is being built near Ayn Rand Museum And Archives Foundation in Austin?
1003 W Martin Luther King Jr Blvd is about 58 m from Ayn Rand Museum And Archives Foundation (1000 W Martin Luther King Jr Blvd). Its latest filing is for emergency fix. 1003 w mlk jr blvd apt b. receptacle was added into apt a garage and was back feeding into apt b phase.
Is there other construction near 1003 W Martin Luther King Jr Blvd?
Yes. Nearby filings include 1005 W Martin Luther King Jr Blvd (express - existing foundation repair unit a&b, Sep 9, 2024); 1810 San Gabriel St (utility disconnect/reconnect. install tesla backup gateway. overhead. ae. meter can does not need replacing- no espa attached, Feb 5, 2025); 1802 San Gabriel St (replacement of an existing water heater we are exchanging the water heater for a similar model, Apr 14, 2026).
How do I get alerts for new permits at 1003 W Martin Luther King Jr Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78701- 1005 W Martin Luther King Jr BlvdSep 9, 2024Express - existing foundation repair unit a&b · 24 m away
- 1810 San Gabriel StFeb 5, 2025Utility disconnect/reconnect. install tesla backup gateway. overhead. ae. meter can does not need replacing- no espa attached · 25 m away
- 1802 San Gabriel StApr 14, 2026Replacement of an existing water heater we are exchanging the water heater for a similar model · 43 m away
- 1900 San Gabriel StOct 27, 2025Cap off for water and wastewater for demolition of a three-story multifamily structure approx. 19965 sq ft circa 1984 2025 099572 da - approved · 51 m away
- 1813 Vance CirSep 16, 2026Replacement of complete existing central heat and air system with or without duct work · 55 m away
- 1000 Martin Luther King Jr BlvdSep 11, 2026Ari · 57 m away
- 1000 W Martin Luther King Jr Blvd · Ayn Rand Museum And Archives FoundationOct 9, 2026Eplan: commercial expedited review - [approved] new construction of institutional building for exhibition library offices and classrooms. scope to also include covered parking garage low hazard storage reflecting pool mechanical yard and garden (27144) · 58 m away
- 1014 Martin Luther King Jr BlvdApr 13, 20201014 w. martin luther king, jr blvd · 58 m away
- 1807 San Gabriel StApr 28, 2025Express: replacing 10 windows like for like · 65 m away
- 1805 San Gabriel StApr 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage heat pump system · 71 m away
- 1807 Vance CirOct 11, 2024Run 38 feet of sewer line · 76 m away
- 1803 San Gabriel StAug 6, 2026Replacement of complete existing central heat and air system with or without duct work change out of ruud 3.5 ton choice (up-flow) heat pump · 76 m away