1805 San Gabriel St
Austin, TX 78701
1805 San Gabriel St: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1805 San Gabriel St, Austin, TX 78701 since March 19, 2024. The most recent, filed April 28, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage heat pump system”.
Compiled from City of Austin records · updated Apr 28, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Apr 28, 2025
- since Mar 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage heat pump system
- AppliedApr 23, 2025
- IssuedApr 28, 2025
- WorkApr '25 – May '25
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage heat pump system
Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage heat pump system
City of Austin permitMechanical PermitFinal- Record
- 2025-049761 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace 12 windows 2 doors-like for like
Express: replace 12 windows 2 doors-like for like
City of Austin permitBuilding PermitFinal- Record
- 2024-033844 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1805 San Gabriel St
What is being built at 1805 San Gabriel St?
The latest filing (City of Austin permit 2025-049761 MP, April 28, 2025) covers replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage heat pump system.
How many permits and filings does 1805 San Gabriel St have?
2 filings across 2 projects, from March 19, 2024 to April 28, 2025.
What is being built near Ayn Rand Museum And Archives Foundation in Austin?
1805 San Gabriel St is about 71 m from Ayn Rand Museum And Archives Foundation (1000 W Martin Luther King Jr Blvd). Its latest filing is for replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage heat pump system.
Is there other construction near 1805 San Gabriel St?
Yes. Nearby filings include 1807 San Gabriel St (express: replacing 10 windows like for like, Apr 28, 2025); 1803 San Gabriel St (replacement of complete existing central heat and air system with or without duct work change out of ruud 3.5 ton choice (up-flow) heat pump, Aug 6, 2026); 1810 San Gabriel St (utility disconnect/reconnect. install tesla backup gateway. overhead. ae. meter can does not need replacing- no espa attached, Feb 5, 2025).
How do I get alerts for new permits at 1805 San Gabriel St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78701- 1807 San Gabriel StApr 28, 2025Express: replacing 10 windows like for like · 17 m away
- 1803 San Gabriel StAug 6, 2026Replacement of complete existing central heat and air system with or without duct work change out of ruud 3.5 ton choice (up-flow) heat pump · 20 m away
- 1810 San Gabriel StFeb 5, 2025Utility disconnect/reconnect. install tesla backup gateway. overhead. ae. meter can does not need replacing- no espa attached · 50 m away
- 1802 San Gabriel StApr 14, 2026Replacement of an existing water heater we are exchanging the water heater for a similar model · 66 m away
- 1800 San Gabriel StApr 15, 2025Replacement of complete existing central heat and air system with or without duct work 4 ton 2-stage vertical gas system · 69 m away
- 1003 W Martin Luther King Jr BlvdJul 19, 2024Emergency fix. 1003 w mlk jr blvd apt b. receptacle was added into apt a garage and was back feeding into apt b phase · 71 m away
- 1000 W Martin Luther King Jr Blvd · Ayn Rand Museum And Archives FoundationOct 9, 2026Eplan: commercial expedited review - [approved] new construction of institutional building for exhibition library offices and classrooms. scope to also include covered parking garage low hazard storage reflecting pool mechanical yard and garden (27144) · 71 m away
- 1000 Martin Luther King Jr BlvdSep 11, 2026Ari · 82 m away
- 909 W 18th StSep 10, 2026Interior remodel- demolition of level one interior space. reconfiguration of level 1 floorplan with new walls cabinetry and finishes. replacement windows and doors to match existing sizes/shapes · 85 m away
- 1804 Pearl StMar 27, 2024Need to repair 3 meter and 3 pnls on multi unit · 87 m away
- 900 W 18th StJun 26, 2025Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 1900 San Gabriel StOct 27, 2025Cap off for water and wastewater for demolition of a three-story multifamily structure approx. 19965 sq ft circa 1984 2025 099572 da - approved · 92 m away