1804 Pearl St
Austin, TX 78701
Electrical repairs permitted at 1804 Pearl St
An electrical permit filed March 27, 2024, describes repairs to three meters and three panels at 1804 Pearl St in Austin. The City of Austin record lists the permit as expired.
Summarized from City of Austin records · updated Mar 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 27, 2024
- since Mar 27, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredNeed to repair 3 meter and 3 pnls on multi unit
- AppliedFeb 21, 2024
- IssuedMar 27, 2024
- !WorkMar '24 – Sep '24
- Final inspection
Marked expired Oct 1, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectNeed to repair 3 meter and 3 pnls on multi unit
Need to repair 3 meter and 3 pnls on multi unit
City of Austin permitElectrical PermitExpired- Record
- 2024-021296 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1804 Pearl St
What work was permitted at 1804 Pearl St?
The permit describes repairs to three meters and three panels at the multi-unit property.
When was the electrical permit filed for 1804 Pearl St?
The City of Austin permit, 2024-021296 EP, was filed March 27, 2024.
Is the permit for 1804 Pearl St still active?
No. The City of Austin record lists permit 2024-021296 EP as expired.
Is new construction planned at 1804 Pearl St?
The available permit describes electrical repairs, not new construction.
Does the permit show that the electrical work at 1804 Pearl St is complete?
The record lists the permit as expired, but does not state whether the repairs were completed.
What's being permitted near the Ayn Rand Museum and Archives Foundation?
A City of Austin electrical permit for repairs to three meters and three panels was filed at 1804 Pearl St, about 135 meters from the Ayn Rand Museum and Archives Foundation.
Also being built nearby
All of 78701- 900 W 18th StJun 26, 2025Replacement of complete existing central heat and air system with or without duct work · 16 m away
- 903 W 18th StMay 18, 2026Building b (existing detached garage & guesthouse) the first floor will have interior walls removed and relocated. the second floor will remain as is. new structural members to support wall relocations. the first floor will be connected to the second floor by new wood-framed stairs in the hallway. the existing footprint will remain; no additional living space will be added. there is a new door on the west wall on the ground floor · 75 m away
- 1805 San Gabriel StApr 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage heat pump system · 87 m away
- 1803 San Gabriel StAug 6, 2026Replacement of complete existing central heat and air system with or without duct work change out of ruud 3.5 ton choice (up-flow) heat pump · 91 m away
- 1807 San Gabriel StApr 28, 2025Express: replacing 10 windows like for like · 91 m away
- 809 Martin Luther King Jr BlvdMar 2, 2007Parkside medical services-faulkner center · 95 m away
- 1802 West AveJan 29, 2026Replaced burnt panel · 97 m away
- 909 W 18th StSep 10, 2026Interior remodel- demolition of level one interior space. reconfiguration of level 1 floorplan with new walls cabinetry and finishes. replacement windows and doors to match existing sizes/shapes · 97 m away
- 807 Martin Luther King Jr BlvdAug 31, 2009Parkside medical services subdivision — parkside medical services subdivision · 105 m away
- 908 W Martin Luther King Jr BlvdJan 2, 2025Exterior work only - satellite replacement · 120 m away
- 805 Martin Luther King Jr BlvdMar 2, 2007Parkside medical services subdivision — parkside medical services subdivision · 122 m away
- 808 W 17th StMar 11, 2026Replace interior hot and cold water lines with uponor pex pipe & replace water heater **tub to shower conversion in one bathroom express · 127 m away