1804 Vance Cir
Austin, TX 78701
1804 Vance Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 1804 Vance Cir, Austin, TX 78701. The most recent, filed June 24, 2024, covers: “Per tx gas- relocate gas meter away from window and electrical”.
Compiled from City of Austin records · updated Jun 24, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 24, 2024
- since Jun 24, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPer tx gas- relocate gas meter away from window and electrical
- AppliedJun 21, 2024
- IssuedJun 24, 2024
- WorkJun '24 – Jun '24
- Final inspectionJun 25, 2024
Passed final inspection Jun 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectPer tx gas- relocate gas meter away from window and electrical
Per tx gas- relocate gas meter away from window and electrical
City of Austin permitPlumbing PermitFinal- Record
- 2024-077969 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1804 Vance Cir
What is being built at 1804 Vance Cir?
The latest filing (City of Austin permit 2024-077969 PP, June 24, 2024) covers per tx gas- relocate gas meter away from window and electrical.
How many permits and filings does 1804 Vance Cir have?
1 filing across 1 project, from June 24, 2024 to June 24, 2024.
Is there other construction near 1804 Vance Cir?
Yes. Nearby filings include 1808 Vance Cir (vance park, lot b, first resubdivision, Sep 11, 2020); 1807 Vance Cir (run 38 feet of sewer line, Oct 11, 2024); 1801 Lamar Blvd (robert g. mickey addition — robert g. mickey addition, Apr 28, 2009).
How do I get alerts for new permits at 1804 Vance Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78701- 1808 Vance CirSep 11, 2020Vance park, lot b, first resubdivision · 46 m away
- 1807 Vance CirOct 11, 2024Run 38 feet of sewer line · 76 m away
- 1801 Lamar BlvdApr 28, 2009Robert g. mickey addition — robert g. mickey addition · 120 m away
- 1813 Vance CirSep 16, 2026Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 1802 San Gabriel StApr 14, 2026Replacement of an existing water heater we are exchanging the water heater for a similar model · 126 m away
- 1800 San Gabriel StApr 15, 2025Replacement of complete existing central heat and air system with or without duct work 4 ton 2-stage vertical gas system · 130 m away
- 1005 W Martin Luther King Jr BlvdSep 9, 2024Express - existing foundation repair unit a&b · 136 m away
- 1003 W Martin Luther King Jr BlvdJul 19, 2024Emergency fix. 1003 w mlk jr blvd apt b. receptacle was added into apt a garage and was back feeding into apt b phase · 153 m away
- 1911 Robbins PlOct 13, 2026Eplan: residential expedited review - three unit unit1a new construction of 3-story single family res [5bed 4.5bath] · 166 m away
- 1810 San Gabriel StFeb 5, 2025Utility disconnect/reconnect. install tesla backup gateway. overhead. ae. meter can does not need replacing- no espa attached · 172 m away
- 1803 San Gabriel StAug 6, 2026Replacement of complete existing central heat and air system with or without duct work change out of ruud 3.5 ton choice (up-flow) heat pump · 177 m away
- 1014 Martin Luther King Jr BlvdApr 13, 20201014 w. martin luther king, jr blvd · 178 m away