323 Congress Avenue
Austin, TX 78701 · Accenture - 323 Congress 3rd Floor Secure Bay, Accenture - 323 Congress 2nd Floor Break Remodel
Accenture office remodels at 323 Congress Avenue
Two Accenture tenant-area remodels are registered at the multi-tenant building at 323 Congress Avenue. The latest, filed January 28, 2026, adds a wall and door to an existing third-floor open office, with limited electrical and mechanical work. A second-floor breakroom remodel was filed August 28, 2025.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 28, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 28, 2026
- since Aug 28, 2025
- Largest scope
- 1,670 sf
- Estimated cost
- $220K
- state registration
Where this project stands
CompletedAccenture - 323 Congress 3rd Floor Secure Bay
1,670 sq ft · $105K est.
- RegisteredJan 28, 2026
- Plan review
- ConstructionFeb '26 – Apr '26
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsInterior remodel of tenant's existing level 3 open office to include addition of new wall and door and limited electrical and mechanical. — 323 congress
TDLR project registrationRenovation/AlterationProject Closed1,670 sq ft$105K est.- Project #
- TABS2026011046
- Tenant / owner
- Accenture - 323 Congress 3rd Floor Secure Bay
- Design firm
- Pro
- Contact
- Pro
Partial floor remodel of existing tenant breakroom involving replacement of appliances, new millwork and new electrical, mechanical and plumbing. — 323 congress
TDLR project registrationRenovation/AlterationReview Complete1,525 sq ft$220K est.- Project #
- TABS2025026990
- Tenant / owner
- Accenture - 323 Congress 2nd Floor Break Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 323 Congress Avenue
What is being built at 323 Congress Avenue?
TDLR records show interior remodels to Accenture tenant spaces in the multi-tenant building: a third-floor office area and a second-floor breakroom. The records describe alterations to existing space, not a new building.
When was the latest project at 323 Congress permitted?
The third-floor secure bay project was registered on January 28, 2026, under TDLR number TABS2026011046. Its record describes a new wall and door and limited electrical and mechanical work.
What is changing in the second-floor breakroom at 323 Congress?
A project filed August 28, 2025, covers replacement appliances, new millwork, and electrical, mechanical, and plumbing work in an existing tenant breakroom. It is listed as TABS2025026990.
Is Accenture the only tenant at 323 Congress Avenue?
The property is identified as a multi-tenant building. The records identify Accenture projects on the second and third floors but do not list all tenants.
What is being remodeled near 301 Congress?
At 323 Congress, about 22 meters from 301 Congress, TDLR records show Accenture tenant-area work: a third-floor office remodel filed January 28, 2026, and a second-floor breakroom remodel filed August 28, 2025.
How much will the 323 Congress Avenue work cost?
The TDLR sheet lists an estimated project cost of $220,180 for the second-floor breakroom remodel. That is an applicant estimate, not a total cost for all work at the address.
Also being built nearby
All of 78701- 323 Congress AveFeb 24, 2026Interior remodel - single tenant floor - secure bay
- 327 Congress AveDec 13, 2023Replacement of an existing water heater. change out a roof top boiler like for like · 4 m away
- 315 Congress AveSep 8, 2026Reconstruction from previous water damage · 8 m away
- 320 Congress AveMar 20, 2024Austin deep massage - wall sign · 13 m away
- 318 Congress AveMar 26, 2025Service upgrade see attached espa and drawings 318 congress & 318 congress #b · 13 m away
- 312 Congress AveMay 31, 2024Replacement of complete existing central heat and air system with or without duct work · 16 m away
- 301 Congress Ave, Level 8 · Pr 301 Congress LPSep 18, 2026301 congress level 8 certinia — renovation/alteration — interior renovation of existing conditions on level 8, including construction of ceilings, walls, finishes, and associated mep improvements · 22 m away
- 301 Congress Ave · Pr 301 Congress LPNov 9, 2026Interior non structural demolition · 22 m away
- 301 Congress Avenue · Pr 301 Congress LPSep 11, 2024301 congress spec suite 1370 — renovation/alteration — spec suite buildout on floor 13, including demolition and construction of non-structural partitons, ceilings, finishes, equipment and associated mep improvements · 22 m away
- 301 Congress, Level 18 · Pr 301 Congress LPAug 13, 2026Level 18 corridor and restroom remodel — renovation/alteration — interior renovation of existing restroom, multi-tenant corridor, and elevator lobby · 22 m away
- 301 Congress Level 7 · Pr 301 Congress LPFeb 10, 2026Ninjaone gender neutral restrooms — renovation/alteration — addition of gender neutral restrooms to existing suite on levels 5 and 7 · 22 m away
- 301 Congress · Pr 301 Congress LPAug 28, 2025301 congress spec suite 1300 — renovation/alteration — spec suite buildout on floor 13, including demolition and construction of non-structural partitions, ceilings, finishes, equipment and associated mep improvements · 22 m away
More offices in 78701.