327 Congress Ave
Austin, TX 78701
Water heater and rooftop boiler replacement at 327 Congress Ave
A permit covers replacement of an existing water heater and a like-for-like rooftop boiler changeout at 327 Congress Ave. The City of Austin permit was filed on December 13, 2023, and is marked final.
Summarized from City of Austin records · updated Dec 13, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 13, 2023
- since Dec 13, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater. change out a roof top boiler like for like
- AppliedNov 28, 2023
- IssuedDec 13, 2023
- WorkDec '23 – Feb '24
- Final inspectionFeb 22, 2024
Passed final inspection Feb 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater. change out a roof top boiler like for like
Replacement of an existing water heater. change out a roof top boiler like for like
City of Austin permitPlumbing PermitFinal- Record
- 2023-152385 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 327 Congress Ave
What work is permitted at 327 Congress Ave in Austin?
The permit covers replacement of an existing water heater and a like-for-like changeout of a rooftop boiler.
When was the permit for 327 Congress Ave filed?
The City of Austin filed permit 2023-152385 PP on December 13, 2023. Its status is final.
Is a new building being built at 327 Congress Ave?
The available permit describes equipment replacement: a water heater and a rooftop boiler. It does not describe construction of a new building.
What is happening near Cpreif Congress Commons at 323 Congress Avenue?
At 327 Congress Ave, a City of Austin permit covers replacement of an existing water heater and a like-for-like rooftop boiler changeout. The permit was filed December 13, 2023.
What does permit 2023-152385 PP cover?
It covers a plumbing permit for replacing an existing water heater and changing out a rooftop boiler like for like. The permit is marked final.
Also being built nearby
All of 78701- 323 Congress AveFeb 24, 2026Interior remodel - single tenant floor - secure bay · 4 m away
- 323 Congress Avenue · Cpreif Congress Commons, LLCJan 28, 2026Accenture - 323 congress 3rd floor secure bay — renovation/alteration — interior remodel of tenant's existing level 3 open office to include addition of new wall and door and limited electrical and mechanical · 4 m away
- 315 Congress AveSep 8, 2026Reconstruction from previous water damage · 12 m away
- 320 Congress AveMar 20, 2024Austin deep massage - wall sign · 14 m away
- 318 Congress AveMar 26, 2025Service upgrade see attached espa and drawings 318 congress & 318 congress #b · 15 m away
- 312 Congress AveMay 31, 2024Replacement of complete existing central heat and air system with or without duct work · 19 m away
- 301 Congress, Level 18 · Pr 301 Congress LPAug 13, 2026Level 18 corridor and restroom remodel — renovation/alteration — interior renovation of existing restroom, multi-tenant corridor, and elevator lobby · 26 m away
- 301 Congress Level 7 · Pr 301 Congress LPFeb 10, 2026Ninjaone gender neutral restrooms — renovation/alteration — addition of gender neutral restrooms to existing suite on levels 5 and 7 · 26 m away
- 301 Congress Ave, Level 8 · Pr 301 Congress LPSep 18, 2026301 congress level 8 certinia — renovation/alteration — interior renovation of existing conditions on level 8, including construction of ceilings, walls, finishes, and associated mep improvements · 26 m away
- 301 Congress · Pr 301 Congress LPAug 28, 2025301 congress spec suite 1300 — renovation/alteration — spec suite buildout on floor 13, including demolition and construction of non-structural partitions, ceilings, finishes, equipment and associated mep improvements · 26 m away
- 301 Congress Ave · Pr 301 Congress LPNov 9, 2026Interior non structural demolition · 26 m away
- 301 Congress Avenue · Pr 301 Congress LPSep 11, 2024301 congress spec suite 1370 — renovation/alteration — spec suite buildout on floor 13, including demolition and construction of non-structural partitons, ceilings, finishes, equipment and associated mep improvements · 26 m away