Expired site-plan case filed for Cesar Chavez Project
An Austin site-plan case labeled “Cesar Chavez Project” was filed for 2024-1/2 Cesar Chavez St on August 10, 2024. The case is marked expired and does not specify a building type, size, or intended use.
Summarized from City of Austin records · updated Aug 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 10, 2024
- since Aug 10, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2024-1/2 Cesar Chavez St
What is being built at 2024-1/2 Cesar Chavez St?
The City of Austin record is a site-plan case labeled “Cesar Chavez Project,” but it does not describe what would be built. The case is marked expired.
Is there a site-plan application for 2024-1/2 Cesar Chavez St?
Yes. Austin case 13035092 was filed on August 10, 2024, under the name “Cesar Chavez Project.”
Is the Cesar Chavez Project approved?
The available record lists case 13035092 as expired. It does not provide an approval status.
When was the site-plan case filed?
The City of Austin case was filed on August 10, 2024.
Does the record say what the Cesar Chavez Project will be used for?
No. The record gives the project name and identifies it as a site-plan case, but does not specify a use.
Also being built nearby
All of 78702- 2028 E. Cesar Chavez · Cesar Chavez RealtyJan 24, 2024Cesar chavez office renovation — additions to existing building — remodel and addition to office to include adding a dormer to the 2nd floor (1 office, 1 conference room, and 1 bathroom) · 18 m away
- 2020 Cesar Chavez StJun 11, 2008Bucket deli · 30 m away
- 105 Elkhart StMar 21, 2025Building #2 new three story dwelling unit 3 bed/3.5 bath with attached covered carport (three unit use) · 36 m away
- 2012 Cesar Chavez StApr 29, 20232012 e cesar chavez · 59 m away
- 2015 E 2nd StJul 4, 2024Eplan: residential expedited review - *partial demolition* removal of attached covered deck at rear of existing 1-story single family res. addition of concrete landing and steps · 63 m away
- 2005 Cesar Chavez StFeb 6, 20242005 ecc addition · 67 m away
- 2101 E Cesar Chavez StOct 7, 2026Replacement of outside water line · 71 m away
- 2044 E Cesar Chavez StDec 29, 2023Cap off water/waste water · 71 m away
- 2008 E Cesar Chavez StDec 22, 2023Total demolition of 1254 sq ft sfr circa 1920 previously approved by historic landmark commission - see 2019-043348 pr - so historic review has been waived for this pr · 72 m away
- 2001 E Cesar Chavez StMay 16, 2025Construct new free-standing awning over existing cocktail lounge 2024 164234 da - approved · 76 m away
- 2023 E 2nd StMar 20, 2025Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 2025 E 2nd StJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 97 m away