2044 E Cesar Chavez St
Austin, TX 78702
2044 E Cesar Chavez St: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2044 E Cesar Chavez St, Austin, TX 78702. The most recent, filed December 29, 2023, covers: “Cap off water/waste water”.
Compiled from City of Austin records · updated Dec 29, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 29, 2023
- since Dec 29, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCap off water/waste water
- AppliedJul 17, 2023
- IssuedDec 29, 2023
- WorkDec '23 – Jan '24
- Final inspectionJan 4, 2024
Passed final inspection Jan 4, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsCap off water/waste water
Cap off water/waste water
City of Austin permitPlumbing PermitFinal- Record
- 2023-122842 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Total demolition of 1500 sfr circa 1912
Total demolition of 1500 sfr circa 1912
City of Austin permitBuilding PermitFinal- Record
- 2023-122215 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2044 E Cesar Chavez St
What is being built at 2044 E Cesar Chavez St?
The latest filing (City of Austin permit 2023-122842 PP, December 29, 2023) covers cap off water/waste water.
How many permits and filings does 2044 E Cesar Chavez St have?
2 filings across 2 projects, from December 29, 2023 to December 29, 2023.
What is being built near Cesar Chavez Realty in Austin?
2044 E Cesar Chavez St is about 62 m from Cesar Chavez Realty (2028 E. Cesar Chavez). Its latest filing is for cap off water/waste water.
Is there other construction near 2044 E Cesar Chavez St?
Yes. Nearby filings include 2101 E Cesar Chavez St (replacement of outside water line, Oct 7, 2026); 2028 E. Cesar Chavez (cesar chavez office renovation — additions to existing building — remodel and addition to office to include adding a dormer to the 2nd floor (1 office, 1 conference room, and 1 bathroom), Jan 24, 2024); 2025 E 2nd St (replacement of complete existing central heat and air system with or without duct work, Jan 13, 2025).
How do I get alerts for new permits at 2044 E Cesar Chavez St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 2101 E Cesar Chavez StOct 7, 2026Replacement of outside water line · 35 m away
- 2028 E. Cesar Chavez · Cesar Chavez RealtyJan 24, 2024Cesar chavez office renovation — additions to existing building — remodel and addition to office to include adding a dormer to the 2nd floor (1 office, 1 conference room, and 1 bathroom) · 62 m away
- 2025 E 2nd StJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 2023 E 2nd StMar 20, 2025Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 2024-1/2 Cesar Chavez StAug 10, 2024Cesar chavez project · 71 m away
- 2112 Cesar Chavez StJan 22, 2013El mundo newspaper · 72 m away
- 105 Elkhart StMar 21, 2025Building #2 new three story dwelling unit 3 bed/3.5 bath with attached covered carport (three unit use) · 85 m away
- 2015 E 2nd StJul 4, 2024Eplan: residential expedited review - *partial demolition* removal of attached covered deck at rear of existing 1-story single family res. addition of concrete landing and steps · 96 m away
- 2020 Cesar Chavez StJun 11, 2008Bucket deli · 101 m away
- 2024 E 2nd StApr 2, 2026New pool with required enclosure · 109 m away
- 2022 E 2nd StMay 28, 2026Repiping water lines in 2.5 bath home to replace kitec lines. also installed new tankless water heater · 109 m away
- 2100 E 2nd StAug 21, 2025Performed leak test repaired leak pressure tested system. system has been locked out by texas gas. requires gas inspection. please call 512-571-8476 · 110 m away