46-1/2 Waller St
Austin, TX 78702
46-1/2 Waller St: 1 project on record
City of Austin lists 1 filing across 1 project at 46-1/2 Waller St, Austin, TX 78702. The most recent, filed April 14, 2020, covers: “46 waller alley project”.
Compiled from City of Austin records · updated Apr 14, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Apr 14, 2020
- since Apr 14, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 46-1/2 Waller St
What is being built at 46-1/2 Waller St?
The latest filing (City of Austin case 11230972, April 14, 2020) covers 46 waller alley project.
How many permits and filings does 46-1/2 Waller St have?
1 filing across 1 project, from April 14, 2020 to April 14, 2020.
What is being built near Austin Public Health in Austin?
46-1/2 Waller St is about 163 m from Austin Public Health (15 Waller Street). Its latest filing is for 46 waller alley project.
Is there other construction near 46-1/2 Waller St?
Yes. Nearby filings include 48 Waller St (new construction in-ground pool and spa, Dec 11, 2025); 41 Waller St (replacement of complete existing central heat and air system with or without duct work replace existing hvac system and install a new braynt 2 ton, Mar 10, 2025); 45 Waller St (magnolia addition, amended plat of lots 1-6, of the resub of lot 1, block 1, Aug 12, 2008).
How do I get alerts for new permits at 46-1/2 Waller St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 48 Waller StDec 11, 2025New construction in-ground pool and spa · 35 m away
- 41 Waller StMar 10, 2025Replacement of complete existing central heat and air system with or without duct work replace existing hvac system and install a new braynt 2 ton · 49 m away
- 45 Waller StAug 12, 2008Magnolia addition, amended plat of lots 1-6, of the resub of lot 1, block 1 · 50 m away
- 50 Waller StJun 29, 2026Replacement of complete existing central heat and air system with or without duct work install notes: replace 3.5 ton horizontal heat pump in attic above second floor · 78 m away
- 1107 Lambie StJun 15, 2026Replacement of an existing water heater replacing like/ like tankless water · 81 m away
- 1111 Clermont AveMar 14, 2024Construct new driveway approach of 16 ft · 82 m away
- 1013 Lambie StJan 6, 20141013 lambie street · 92 m away
- 1106 Lambie StAug 28, 20141106 lambie st · 101 m away
- 1101 Clermont AveDec 3, 2024Eplan: residential expedited review - new construction of a 3-story single-family res. [3bed 2.5bath] · 109 m away
- 43 IH 35 SvrdSep 12, 2025Cooee yakka office · 116 m away
- 54 Waller StAug 14, 2025Construct new driveway approach of 13.7 ft · 118 m away
- 1208 Haskell StMay 26, 2026Building 3: new construction 3-unit use single-family residential 2-story 3 bedroom 2.5 bath with covered front porch · 128 m away