48 Waller St
Austin, TX 78702
Permits show two new pool-and-spa projects at 48 Waller St
City of Austin permits indicate two new pool-and-spa projects at 48 Waller St. The first set of permits was filed from May 8 to July 21, 2025, and the second from September 12 to December 11, 2025; both include building, electrical and plumbing permits.
Summarized from City of Austin records · updated Dec 11, 2025
- Projects
- 6
- 6 filings
- Latest filing
- Dec 11, 2025
- since May 8, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew construction in-ground pool and spa
- AppliedJul 1, 2025
- IssuedDec 11, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 16, 2025
Passed final inspection Dec 16, 2025.
1 contact on this project · 1 phone number
Permit & project history
6 projectsNew construction in-ground pool and spa
New construction in-ground pool and spa
City of Austin permitPlumbing PermitFinal- Record
- 2025-114295 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction in-ground pool and spa
New construction in-ground pool and spa
City of Austin permitElectrical PermitFinal- Record
- 2025-114295 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction in-ground pool and spa
New construction in-ground pool and spa
City of Austin permitBuilding PermitFinal- Record
- 2025-114295 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New pool and spa
New pool and spa
City of Austin permitPlumbing PermitFinal- Record
- 2025-053775 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New pool and spa
New pool and spa
City of Austin permitElectrical PermitFinal- Record
- 2025-053775 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New pool and spa
New pool and spa
City of Austin permitBuilding PermitFinal- Record
- 2025-053775 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 48 Waller St
What is being built at 48 Waller St in Austin?
City of Austin permits indicate two new pool-and-spa projects at the address. The records include building, electrical and plumbing permits for each.
When were the pool permits filed at 48 Waller St?
The first set of permits was filed between May 8 and July 21, 2025. A second set was filed between September 12 and December 11, 2025.
What are the permit numbers for the pool projects at 48 Waller St?
The first set is under permit numbers 2025-053775 BP, EP and PP. The second set is under 2025-114295 BP, EP and PP.
Are the pool permits at 48 Waller St final?
The six listed City of Austin permits are marked Final. They cover building, electrical and plumbing work for two pool-and-spa projects.
What is being built near the City of Austin RBJ Parking Lot ADA Improvements on Waller Street?
At 48 Waller St, City of Austin permits indicate two new pool-and-spa projects. The nearby City of Austin RBJ Parking Lot ADA Improvements are listed at 15 Waller Street.
Also being built nearby
All of 78702- 46-1/2 Waller StApr 14, 202046 waller alley project · 35 m away
- 50 Waller StJun 29, 2026Replacement of complete existing central heat and air system with or without duct work install notes: replace 3.5 ton horizontal heat pump in attic above second floor · 44 m away
- 45 Waller StAug 12, 2008Magnolia addition, amended plat of lots 1-6, of the resub of lot 1, block 1 · 51 m away
- 1107 Lambie StJun 15, 2026Replacement of an existing water heater replacing like/ like tankless water · 68 m away
- 1106 Lambie StAug 28, 20141106 lambie st · 71 m away
- 41 Waller StMar 10, 2025Replacement of complete existing central heat and air system with or without duct work replace existing hvac system and install a new braynt 2 ton · 76 m away
- 54 Waller StAug 14, 2025Construct new driveway approach of 13.7 ft · 83 m away
- 1013 Lambie StJan 6, 20141013 lambie street · 89 m away
- 1208 Haskell StMay 26, 2026Building 3: new construction 3-unit use single-family residential 2-story 3 bedroom 2.5 bath with covered front porch · 107 m away
- 1111 Clermont AveMar 14, 2024Construct new driveway approach of 16 ft · 117 m away
- 43 IH 35 SvrdSep 12, 2025Cooee yakka office · 128 m away
- 1105 Holly StMar 20, 2024Construct new driveway approach of 10 ft. driveway approach is from the alley. new adu *change to unit 2 in bp folder · 135 m away