groundranger
Recent · latest filing Jun 2025Residential

1102 Wayside Dr

Austin, TX 78703

1102 Wayside Dr: 2 projects on record

City of Austin lists 2 filings across 2 projects at 1102 Wayside Dr, Austin, TX 78703. The most recent, filed June 10, 2025, covers: “Upgrade 60a electrical service to 200a: install new 200a meter base 200a electrical panel and conduit service riser”.

Compiled from City of Austin records · updated Jun 10, 2025

Projects
2
2 filings
Latest filing
Jun 10, 2025
since Jun 10, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Upgrade 60a electrical service to 200a: install new 200a meter base 200a electrical panel and conduit service riser

  1. AppliedJun 6, 2025
  2. IssuedJun 10, 2025
  3. WorkJun '25 – Jul '25
  4. Final inspectionJul 8, 2025

Passed final inspection Jul 8, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Upgrade 60a electrical service to 200a: install new 200a meter base 200a electrical panel and conduit service riser

    Upgrade 60a electrical service to 200a: install new 200a meter base 200a electrical panel and conduit service riser

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace existing galvanized water piping in and under house with copper. after further investigation plumber had to replace water yard line. jm819

    Replace existing galvanized water piping in and under house with copper. after further investigation plumber had to replace water yard line. jm819

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1102 Wayside Dr

What is being built at 1102 Wayside Dr?

The latest filing (City of Austin permit 2025-070337 EP, June 10, 2025) covers upgrade 60a electrical service to 200a: install new 200a meter base 200a electrical panel and conduit service riser.

How many permits and filings does 1102 Wayside Dr have?

2 filings across 2 projects, from June 10, 2025 to June 10, 2025.

Is there other construction near 1102 Wayside Dr?

Yes. Nearby filings include 1100 Wayside Dr (replacement of complete existing central heat and air system with or without duct work hvac for 2 system change out- one system is a straight cool -furnace (gas) 2nd system is horizontal heat pump (electric), Feb 3, 2026); 1103 Norwalk Ln (gas test and water main replacement roughly 15 feet, Oct 15, 2026); 1102 Heritage Way (repair of ww line under foundation. crack in pipe, Nov 3, 2026).

How do I get alerts for new permits at 1102 Wayside Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78703
Email me when a new permit is filed