2412 W 12th St
Austin, TX 78703
2412 W 12th St: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2412 W 12th St, Austin, TX 78703. The most recent, filed February 23, 2024, covers: “Replace sanitary sewer yard line”.
Compiled from City of Austin records · updated Feb 23, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Feb 23, 2024
- since Feb 23, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sanitary sewer yard line
- AppliedFeb 19, 2024
- IssuedFeb 23, 2024
- WorkFeb '24 – Mar '24
- Final inspectionMar 22, 2024
Passed final inspection Mar 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplace sanitary sewer yard line
Replace sanitary sewer yard line
City of Austin permitPlumbing PermitFinal- Record
- 2024-020407 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition and remodel of 1 story sfr request to disconnect
Addition and remodel of 1 story sfr request to disconnect
City of Austin permitElectrical PermitFinal- Record
- 2023-033746 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2412 W 12th St
What is being built at 2412 W 12th St?
The latest filing (City of Austin permit 2024-020407 PP, February 23, 2024) covers replace sanitary sewer yard line.
How many permits and filings does 2412 W 12th St have?
2 filings across 2 projects, from February 23, 2024 to February 23, 2024.
Is there other construction near 2412 W 12th St?
Yes. Nearby filings include 2411 Quarry Rd (base: installing a backup battery system and additional meter socket, Jul 29, 2026); 2407 Quarry Rd (add a generator interlock & a ground rod, Dec 11, 2024); 2501 Quarry Rd (200amp panel 200amp meter base grounding, Dec 16, 2025).
How do I get alerts for new permits at 2412 W 12th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 2411 Quarry RdJul 29, 2026Base: installing a backup battery system and additional meter socket · 39 m away
- 2407 Quarry RdDec 11, 2024Add a generator interlock & a ground rod · 43 m away
- 2501 Quarry RdDec 16, 2025200amp panel 200amp meter base grounding · 69 m away
- 2401 W 12th StSep 2, 2025Installing new hot and cold stub-outs and a new drain for a bar sink installation. both are altering the existing plumbing system · 71 m away
- 1102 Heritage WayNov 3, 2026Repair of ww line under foundation. crack in pipe · 92 m away
- 1102 Wayside DrJun 10, 2025Upgrade 60a electrical service to 200a: install new 200a meter base 200a electrical panel and conduit service riser · 93 m away
- 2315 Quarry RdSep 13, 2024Install ev charger · 108 m away
- 1100 Wayside DrFeb 3, 2026Replacement of complete existing central heat and air system with or without duct work hvac for 2 system change out- one system is a straight cool -furnace (gas) 2nd system is horizontal heat pump (electric) · 111 m away
- 1105 Norwalk LnJun 14, 2024Repair mast and weather head due to tree knocking it down · 118 m away
- 2508 W 12th StAug 22, 2025Replacement of complete existing central heat and air system with or without duct work condenser located on roof top · 117 m away
- 1103 Norwalk LnOct 15, 2026Gas test and water main replacement roughly 15 feet · 128 m away
- 2505 Quarry RdAug 5, 2026Repair riser on duplex service unit b · 134 m away