1208 Enfield Rd

Austin, TX 78703

Water-line replacement permits filed at 1208 Enfield Road

City of Austin permits filed from April 6 through May 6, 2026, indicate replacement of failing copper water lines with PEX piping at 1208 Enfield Road. The work described serves individual units and includes new hot- and cold-water lines and shutoff valves.

Summarized from City of Austin records · updated May 6, 2026

Projects
16
16 filings
Latest filing
May 6, 2026
since May 29, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Replacing failing and calcified copper with new pex. running new dedicated hot and cold lines with isolation valves for this specific unit. lines will run through the attic from the water heater with hot and cold valves at the supply

  1. AppliedMay 4, 2026
  2. IssuedMay 6, 2026
  3. WorkMay '26 – Nov '26
  4. Final inspection
95% through of the permit windowMay 6, 2026 → Nov 29, 2026

1 contact on this project · 1 phone number

Permit & project history

16 projects
  1. Replacing failing and calcified copper with new pex. running new dedicated hot and cold lines with isolation valves for this specific unit. lines will run through the attic from the water heater with hot and cold valves at the supply

    Replacing failing and calcified copper with new pex. running new dedicated hot and cold lines with isolation valves for this specific unit. lines will run through the attic from the water heater with hot and cold valves at the supply

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacing failing and calcified copper with new pex. running new dedicated hot and cold lines with isolation valves for this specific unit. lines will run through the attic from the water heater with hot and cold valves at the supply

    Replacing failing and calcified copper with new pex. running new dedicated hot and cold lines with isolation valves for this specific unit. lines will run through the attic from the water heater with hot and cold valves at the supply

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacing failing and calcified copper with new pex. running new dedicated hot and cold lines with isolation valves for this specific unit. lines will run through the attic from the water heater with hot and cold valves at the supply

    Replacing failing and calcified copper with new pex. running new dedicated hot and cold lines with isolation valves for this specific unit. lines will run through the attic from the water heater with hot and cold valves at the supply

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Replacing failing copper piping with new pex. pex will be ran from the water heater room with dedicated hot and cold supply for unit 207 isolation valves for lines will be in the water heater room. lines ran through the attic strapped and insulated

    Replacing failing copper piping with new pex. pex will be ran from the water heater room with dedicated hot and cold supply for unit 207 isolation valves for lines will be in the water heater room. lines ran through the attic strapped and insulated

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Repair water pipes for unit 103. replacing with new pex coming from water heater room. running 3/4 main water line to unit with hot and cold shut offs in the boiler room

    Repair water pipes for unit 103. replacing with new pex coming from water heater room. running 3/4 main water line to unit with hot and cold shut offs in the boiler room

    City of Austin permitPlumbing PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Replacing failing copper piping with new pex. pex will be ran from the water heater room with dedicated hot and cold supply for unit 105. isolation valves for lines will be in the water heater room. lines ran through the attic strapped and insulated

    Replacing failing copper piping with new pex. pex will be ran from the water heater room with dedicated hot and cold supply for unit 105. isolation valves for lines will be in the water heater room. lines ran through the attic strapped and insulated

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Replacing failed copper piping for unit 104. running new pex from water heater room. lines will feed unit 104 only with hot and cold isolation valves in the water heater room. lines are run with 3/4 pex through the attic

    Replacing failed copper piping for unit 104. running new pex from water heater room. lines will feed unit 104 only with hot and cold isolation valves in the water heater room. lines are run with 3/4 pex through the attic

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Repair water piping for unit 205. replacing failing copper with pex piping. running new 3/4 pex hot and cold mains from the water heater room to the attic. running though the attic the the unit. lines will have unit specific shut off valves for hot and cold in the boiler room

    Repair water piping for unit 205. replacing failing copper with pex piping. running new 3/4 pex hot and cold mains from the water heater room to the attic. running though the attic the the unit. lines will have unit specific shut off valves for hot and cold in the boiler room

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Repair water piping for unit 206. replacing failing copper with pex piping. running new 3/4 pex hot and cold mains from the water heater room to the attic. running though the attic the the unit. lines will have unit specific shut off valves for hot and cold in the boiler room

    Repair water piping for unit 206. replacing failing copper with pex piping. running new 3/4 pex hot and cold mains from the water heater room to the attic. running though the attic the the unit. lines will have unit specific shut off valves for hot and cold in the boiler room

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Replacing water pipes for unit 201. will run dedicated pex line to the unit with main hot and cold shut off valves from the water heater room. line will be fed with 3/4 pex coming off of a 1 header for hot and cold. 1/2 to each fixture. water lines will be dedicated to unit 201

    Replacing water pipes for unit 201. will run dedicated pex line to the unit with main hot and cold shut off valves from the water heater room. line will be fed with 3/4 pex coming off of a 1 header for hot and cold. 1/2 to each fixture. water lines will be dedicated to unit 201

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Replacing water pipes for unit 101. will run dedicated pex line to the unit with main hot and cold shut off valves from the water heater room. line will be fed with 3/4 pex coming off of a 1 header for hot and cold. water lines will be dedicated to unit 101

    Replacing water pipes for unit 101. will run dedicated pex line to the unit with main hot and cold shut off valves from the water heater room. line will be fed with 3/4 pex coming off of a 1 header for hot and cold. water lines will be dedicated to unit 101

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Running new 2 pex mainline though courtyard up the side of the wall going into the water heater room and tying back into the system at the water heater manifold and the utility room. will also be installing 1-1/4 prv and building shut off valve at the meter. line will be approximately 90 feet long in the trench and 15 ft along the exterior wall bedded with sand and ran with tracer wire

    Running new 2 pex mainline though courtyard up the side of the wall going into the water heater room and tying back into the system at the water heater manifold and the utility room. will also be installing 1-1/4 prv and building shut off valve at the meter. line will be approximately 90 feet long in the trench and 15 ft along the exterior wall bedded with sand and ran with tracer wire

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Repair waterlines for unit 203. currently has no hot water and little water pressure. running new lines from the water heater room. running 3/4 hot and cold viega pex with shut off valves in the water heater room. liens will be coming off a 2 pex main. lines will run up into the attic space and down into the unit walls behind each fixture

    Repair waterlines for unit 203. currently has no hot water and little water pressure. running new lines from the water heater room. running 3/4 hot and cold viega pex with shut off valves in the water heater room. liens will be coming off a 2 pex main. lines will run up into the attic space and down into the unit walls behind each fixture

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Repairing water lines for the unit. installing new pex. pex will be ran from the water heater room to the unit through the attic

    Repairing water lines for the unit. installing new pex. pex will be ran from the water heater room to the unit through the attic

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Replacement of an existing water heater

    Replacement of an existing water heater

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Will excavate 120 under main foundation of structure to repair defective sewer pipe

    Will excavate 120 under main foundation of structure to repair defective sewer pipe

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1208 Enfield Rd

What is being built at 1208 Enfield Road?

The City of Austin permit records describe plumbing work, not a new building: failing copper water lines are being replaced with PEX piping for individual units.

What work is planned at 1208 Enfield Road?

Permits describe new dedicated hot- and cold-water lines, unit-specific shutoff valves, and replacement PEX piping routed through the attic from the water heater room.

When were permits filed for 1208 Enfield Road?

The records span April 6 to May 6, 2026. For example, permit 2026-042273 PP was filed April 14 for water-pipe replacement serving unit 201.

Which units are included in the plumbing work at 1208 Enfield Road?

Permit descriptions identify work for units 101, 103, 104, 105, 201, 205, 206, and 207, along with other unit-specific line replacements.

Are the plumbing permits for 1208 Enfield Road active?

Some listed permits are active and others are expired. For example, permits 2026-055523 PP and 2026-045872 PP are marked active; several permits filed in April are marked expired.

Also being built nearby