groundranger
Historic · latest filing Oct 2024Residential

1510 Windsor Rd

Austin, TX 78703

1510 Windsor Rd: 1 project on record

City of Austin lists 1 filing across 1 project at 1510 Windsor Rd, Austin, TX 78703. The most recent, filed October 15, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.

Compiled from City of Austin records · updated Oct 15, 2024

Projects
1
1 filings
Latest filing
Oct 15, 2024
since Oct 15, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedOct 10, 2024
  2. IssuedOct 15, 2024
  3. WorkOct '24 – May '25
  4. Final inspectionMay 19, 2025

Passed final inspection May 19, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1510 Windsor Rd

What is being built at 1510 Windsor Rd?

The latest filing (City of Austin permit 2024-136995 MP, October 15, 2024) covers replacement of complete existing central heat and air system with or without duct work.

How many permits and filings does 1510 Windsor Rd have?

1 filing across 1 project, from October 15, 2024 to October 15, 2024.

What is being built near Rld Development in Austin?

1510 Windsor Rd is about 128 m from Rld Development (1201 Enfield Road). Its latest filing is for replacement of complete existing central heat and air system with or without duct work.

Is there other construction near 1510 Windsor Rd?

Yes. Nearby filings include 1503 Lorrain St (access at left side of home for access to under pier and beam section home to replace drain lines 45 tunnel under back unit on property to expose original clay yard sewer under this section of the building and replace.90 trench to replace exposed kitchen drain line to new yard, Feb 26, 2026); 1507 Lorrain St (new pool in back yard, Mar 18, 2026); 1208 Enfield Rd (replacing failing and calcified copper with new pex. running new dedicated hot and cold lines with isolation valves for this specific unit. lines will run through the attic from the water heater with hot and cold valves at the supply, May 6, 2026).

How do I get alerts for new permits at 1510 Windsor Rd?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78703
Email me when a new permit is filed