1408 Hardouin Ave
Austin, TX 78703
Plumbing repairs permitted at 1408 Hardouin Ave
City of Austin permits show plumbing work at the existing home: a main water line replacement was permitted June 27, 2024, and a like-for-like gas water heater replacement was permitted October 30, 2025. The records do not indicate new construction.
Summarized from City of Austin records · updated Oct 30, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 30, 2025
- since Jun 27, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater swapping out like for like gas water heater located in attic
- AppliedOct 30, 2025
- IssuedOct 30, 2025
- WorkOct '25 – Nov '25
- Final inspectionNov 19, 2025
Passed final inspection Nov 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of an existing water heater swapping out like for like gas water heater located in attic
Replacement of an existing water heater swapping out like for like gas water heater located in attic
City of Austin permitPlumbing PermitFinal- Record
- 2025-140191 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Main water line to house needs to be replaced in 1â� pex with tracer wire in front yard to house
Main water line to house needs to be replaced in 1â� pex with tracer wire in front yard to house
City of Austin permitPlumbing PermitFinal- Record
- 2024-080585 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1408 Hardouin Ave
What is being built at 1408 Hardouin Ave?
The permits describe plumbing repairs at an existing home, not a new building. Work included replacing the main water line and swapping out a gas water heater.
Is a new home being built at 1408 Hardouin Ave in Austin?
The available City of Austin records do not show a new home. They show permits for plumbing work at the existing residence.
What plumbing work was permitted at 1408 Hardouin Ave?
Permit 2024-080585 PP covers replacing the main water line to the house. Permit 2025-140191 PP covers replacing an existing attic gas water heater with a like-for-like unit.
When was the water line replacement permitted at 1408 Hardouin Ave?
The City of Austin permit for the main water line replacement, 2024-080585 PP, was filed June 27, 2024.
When was the water heater replacement permitted at 1408 Hardouin Ave?
Permit 2025-140191 PP was filed October 30, 2025, for a like-for-like replacement of the existing gas water heater in the attic.
Also being built nearby
All of 78703- 1406 Hardouin AveAug 1, 2024Replacement of complete existing central heat and air system with or without duct work · 25 m away
- 1502 Hardouin AveSep 2, 2025Upgrade service to 350amps and relocate main service point to back of existing garage (overhead) and install new underground feeder to main home with new panel · 45 m away
- 1411 Hardouin AveJul 3, 2025New pool 220 sq ft · 58 m away
- 1501 Hardouin AveDec 10, 2025Install 200 amp automatic transfer switch for existing generator · 61 m away
- 1504 Hardouin AveOct 12, 2026Express: remodel two existing bathrooms; replace fixtures and finishes; minor plumbing electrical and mechanical work for vent fan; drywall replacement and repair. no structural changes or changes to room layouts · 66 m away
- 1403 Wathen AveMay 22, 2024Replacement of condenser and coil only. replacement of gas package unit · 75 m away
- 1400 Hardouin AveJul 23, 2025Replacement of complete existing central heat and air system with or without duct work main/ upstairs unit · 83 m away
- 1403 Hardouin AveSep 13, 2026Eplan: residential expedited review - new construction of a 2-story accessory to primary. [1bed 1bath] with attached garage · 106 m away
- 1406 Wooldridge DrApr 24, 2026Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 111 m away
- 1406 Wathen AveFeb 6, 2024Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 1408 Wathen AveJun 3, 202610 tunnel below the foundation to replace hall bath drain line.1 access hole - right side and 20 tunnel below the foundation to replace kitchen drain line · 116 m away
- 1511 Hardouin AveApr 29, 2026Eplan: residential expedited review - addition and remodel to existing 2-story single family res. work to include: interior remodel and addition with habitable attic [4bed 4.5bath] and uncovd deck · 129 m away