1502 Hardouin Ave
Austin, TX 78703
1502 Hardouin Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1502 Hardouin Ave, Austin, TX 78703. The most recent, filed September 2, 2025, covers: “Upgrade service to 350amps and relocate main service point to back of existing garage (overhead) and install new underground feeder to main home with new panel”.
Compiled from City of Austin records · updated Sep 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 2, 2025
- since Sep 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade service to 350amps and relocate main service point to back of existing garage (overhead) and install new underground feeder to main home with new panel
- AppliedApr 21, 2025
- IssuedSep 2, 2025
- WorkSep '25 – Sep '25
- Final inspectionSep 24, 2025
Passed final inspection Sep 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade service to 350amps and relocate main service point to back of existing garage (overhead) and install new underground feeder to main home with new panel
Upgrade service to 350amps and relocate main service point to back of existing garage (overhead) and install new underground feeder to main home with new panel
City of Austin permitElectrical PermitFinal- Record
- 2025-048054 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1502 Hardouin Ave
What is being built at 1502 Hardouin Ave?
The latest filing (City of Austin permit 2025-048054 EP, September 2, 2025) covers upgrade service to 350amps and relocate main service point to back of existing garage (overhead) and install new underground feeder to main home with new panel.
How many permits and filings does 1502 Hardouin Ave have?
1 filing across 1 project, from September 2, 2025 to September 2, 2025.
Is there other construction near 1502 Hardouin Ave?
Yes. Nearby filings include 1504 Hardouin Ave (express: remodel two existing bathrooms; replace fixtures and finishes; minor plumbing electrical and mechanical work for vent fan; drywall replacement and repair. no structural changes or changes to room layouts, Oct 12, 2026); 1408 Hardouin Ave (replacement of an existing water heater swapping out like for like gas water heater located in attic, Oct 30, 2025); 1501 Hardouin Ave (install 200 amp automatic transfer switch for existing generator, Dec 10, 2025).
How do I get alerts for new permits at 1502 Hardouin Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 1504 Hardouin AveOct 12, 2026Express: remodel two existing bathrooms; replace fixtures and finishes; minor plumbing electrical and mechanical work for vent fan; drywall replacement and repair. no structural changes or changes to room layouts · 21 m away
- 1408 Hardouin AveOct 30, 2025Replacement of an existing water heater swapping out like for like gas water heater located in attic · 45 m away
- 1501 Hardouin AveDec 10, 2025Install 200 amp automatic transfer switch for existing generator · 57 m away
- 1406 Hardouin AveAug 1, 2024Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 1411 Hardouin AveJul 3, 2025New pool 220 sq ft · 80 m away
- 1511 Hardouin AveApr 29, 2026Eplan: residential expedited review - addition and remodel to existing 2-story single family res. work to include: interior remodel and addition with habitable attic [4bed 4.5bath] and uncovd deck · 91 m away
- 1512 Hardouin AveSep 3, 2025Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 93 m away
- 2511 Harris BlvdJan 29, 2026We are upgrading overhead 200amps service to a 320amps overhead service on a rack · 100 m away
- 1403 Wathen AveMay 22, 2024Replacement of condenser and coil only. replacement of gas package unit · 109 m away
- 1408 Wathen AveJun 3, 202610 tunnel below the foundation to replace hall bath drain line.1 access hole - right side and 20 tunnel below the foundation to replace kitchen drain line · 116 m away
- 1406 Wathen AveFeb 6, 2024Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 1400 Hardouin AveJul 23, 2025Replacement of complete existing central heat and air system with or without duct work main/ upstairs unit · 127 m away