groundranger
Recent · latest filing Sep 2025Residential

1512 Hardouin Ave

Austin, TX 78703

1512 Hardouin Ave: 1 project on record

City of Austin lists 1 filing across 1 project at 1512 Hardouin Ave, Austin, TX 78703. The most recent, filed September 3, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork”.

Compiled from City of Austin records · updated Sep 3, 2025

Projects
1
1 filings
Latest filing
Sep 3, 2025
since Sep 3, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork

  1. AppliedSep 2, 2025
  2. IssuedSep 3, 2025
  3. WorkSep '25 – Sep '25
  4. Final inspectionSep 16, 2025

Passed final inspection Sep 16, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork

    Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1512 Hardouin Ave

What is being built at 1512 Hardouin Ave?

The latest filing (City of Austin permit 2025-110800 MP, September 3, 2025) covers replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork.

How many permits and filings does 1512 Hardouin Ave have?

1 filing across 1 project, from September 3, 2025 to September 3, 2025.

Is there other construction near 1512 Hardouin Ave?

Yes. Nearby filings include 2506 Harris Blvd (install car charger in garage, May 12, 2025); 1511 Hardouin Ave (eplan: residential expedited review - addition and remodel to existing 2-story single family res. work to include: interior remodel and addition with habitable attic [4bed 4.5bath] and uncovd deck, Apr 29, 2026); 2511 Harris Blvd (we are upgrading overhead 200amps service to a 320amps overhead service on a rack, Jan 29, 2026).

How do I get alerts for new permits at 1512 Hardouin Ave?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78703
Email me when a new permit is filed