Solar and battery system permitted at 1505 W 29th St

A City of Austin permit filed September 10, 2025, lists installation of an 11.5-kW solar photovoltaic system and 30-kWh energy storage system at the residence. A separate permit filed October 2, 2025, requests disconnection of a 200-amp microgrid interconnection device; the existing 200-amp meter can is to remain.

Summarized from City of Austin records · updated Oct 2, 2025

Projects
2
2 filings
Latest filing
Oct 2, 2025
since Sep 10, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Request to disconnect installation of 200 amp microgrid interconnection device on service with existing 200 amp meter can to remain

  1. AppliedSep 23, 2025
  2. IssuedOct 2, 2025
  3. WorkOct '25 – Nov '25
  4. Final inspectionNov 17, 2025

Passed final inspection Nov 17, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Request to disconnect installation of 200 amp microgrid interconnection device on service with existing 200 amp meter can to remain

    Request to disconnect installation of 200 amp microgrid interconnection device on service with existing 200 amp meter can to remain

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of 11.5kw solar pv and 30kwh energy storage system to residence

    Installation of 11.5kw solar pv and 30kwh energy storage system to residence

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1505 W 29th St

What is being installed at 1505 W 29th St?

A City of Austin electrical permit lists an 11.5-kW solar photovoltaic system and 30-kWh energy storage system for the residence. The permit, 2025-109917 EP, was filed September 10, 2025.

Is a battery system included with the solar installation?

Yes. The September 10, 2025, permit describes a 30-kWh energy storage system alongside the solar panels.

How large is the solar system at 1505 W 29th St?

The permit describes an 11.5-kW solar photovoltaic system. It also lists 30 kWh of energy storage.

When was the solar permit filed?

The City of Austin filed electrical permit 2025-109917 EP on September 10, 2025. Its recorded status is Final.

What does the October 2025 permit say about a microgrid device?

Permit 2025-121113 EP, filed October 2, 2025, requests disconnection of an installation of a 200-amp microgrid interconnection device. The description says the existing 200-amp meter can is to remain.